Feb 23, 2011 SiPM Electrical and Cooling
From GlueXWiki
Action Items from previous meetings
- Determine if swapped bias pins was accidental or in design (Chris)
- Make low voltage cables for the SiPM test (Chris)
- Acquire material to absorb water for the box (Carl)
- Order dew point sensor (Jim)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Chris is out but sent these notes)
- The 80 U Boards will be delivered tomorrow and I have all the parts in house
- I have finished and tested the last 4-Up BCAL test boards and installed it in the test fixture in 126
- I installed the additional 3 power cables to power the boards
- I built up 8 more of the Samtec to CAEN adapter boards and asked Jim F. to bring them to the meeting today. I am waiting on parts to finish the last 4.
- SiPM testing (Ivan)
Minutes
Attending: