Difference between revisions of "Feb 28, 2012 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Created page with "''<font color=red>Teleconference Time: 11:00 a.m. EST</font>''' * <font color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> * Phone con...")
 
(Tentative Agenda)
Line 25: Line 25:
 
# Announcements
 
# Announcements
 
# Review of Action Items
 
# Review of Action Items
# [[GlueX-Collaboration-Feb-2012|Collaboration Meeting]]
 
## Friday at 2:30pm, 4 30 minute talks.
 
 
# Monitoring.
 
# Monitoring.
 
# FCAL
 
# FCAL
 
## Construction Status: mechanical, bases (notes from Matt)
 
## Construction Status: mechanical, bases (notes from Matt)
 +
##* Paul and I both visited Total Electronics (the vendor for the CW bases) last Thursday.  We went through a variety of issues regarding coating and assembly.  They appear to understand where their procedure is deficient.  Again, they are saying all the right things.  The big question is:  will the next batch of boards show improvements in production quality?  We'll see.
 
## Beam tests in Hall B (John)
 
## Beam tests in Hall B (John)
 
# BCAL
 
# BCAL
 
## [[BCAL Beam Tests 2012]]
 
## [[BCAL Beam Tests 2012]]
 
# USM update
 
# USM update
## [https://halldweb1.jlab.org/wiki/images/6/6f/Report_6.pdf Run manager report (Javiera)]
 
## [https://halldweb1.jlab.org/wiki/images/2/2c/02_14_my_pres_Hall-D.pdf Update on Station 3 (Hayk)]
 
 
# TDR update
 
# TDR update
 
## [[Private:Instructions for the TDR | Instructions for  the TDR]] (You must be logged into the wiki to access this page).
 
## [[Private:Instructions for the TDR | Instructions for  the TDR]] (You must be logged into the wiki to access this page).
## We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry. See above for old and new proposed outlines.
+
## We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry.  
 
# Simulations/Reconstruction
 
# Simulations/Reconstruction
 
# Any other business
 
# Any other business

Revision as of 08:31, 28 February 2012

Teleconference Time: 11:00 a.m. EST'

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947


Items for followup from previous meeting(s)

  1. Monitoring
    • Send additional SiPMs to Athens for tests (Elton). Electronics is out for fabrication


Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Monitoring.
  4. FCAL
    1. Construction Status: mechanical, bases (notes from Matt)
      • Paul and I both visited Total Electronics (the vendor for the CW bases) last Thursday. We went through a variety of issues regarding coating and assembly. They appear to understand where their procedure is deficient. Again, they are saying all the right things. The big question is: will the next batch of boards show improvements in production quality? We'll see.
    2. Beam tests in Hall B (John)
  5. BCAL
    1. BCAL Beam Tests 2012
  6. USM update
  7. TDR update
    1. Instructions for the TDR (You must be logged into the wiki to access this page).
    2. We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry.
  8. Simulations/Reconstruction
  9. Any other business

Minutes

Attending: