Difference between revisions of "Feb 28, 2012 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 30: Line 30:
 
##* Paul and I both visited Total Electronics (the vendor for the CW bases) last Thursday.  We went through a variety of issues regarding coating and assembly.  They appear to understand where their procedure is deficient.  Again, they are saying all the right things.  The big question is:  will the next batch of boards show improvements in production quality?  We'll see.
 
##* Paul and I both visited Total Electronics (the vendor for the CW bases) last Thursday.  We went through a variety of issues regarding coating and assembly.  They appear to understand where their procedure is deficient.  Again, they are saying all the right things.  The big question is:  will the next batch of boards show improvements in production quality?  We'll see.
 
## Beam tests in Hall B (John)
 
## Beam tests in Hall B (John)
 +
##*[http://dustbunny.physics.indiana.edu/~kmoriya/note.pdf small note] on distance from CLAS scintillators by Kei
 
# BCAL
 
# BCAL
 
## [[BCAL Beam Tests 2012]]
 
## [[BCAL Beam Tests 2012]]

Revision as of 12:04, 28 February 2012

Teleconference Time: 11:00 a.m. EST'

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947


Items for followup from previous meeting(s)

  1. Monitoring
    • Send additional SiPMs to Athens for tests (Elton). Electronics is out for fabrication


Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Monitoring.
  4. FCAL
    1. Construction Status: mechanical, bases (notes from Matt)
      • Paul and I both visited Total Electronics (the vendor for the CW bases) last Thursday. We went through a variety of issues regarding coating and assembly. They appear to understand where their procedure is deficient. Again, they are saying all the right things. The big question is: will the next batch of boards show improvements in production quality? We'll see.
    2. Beam tests in Hall B (John)
      • small note on distance from CLAS scintillators by Kei
  5. BCAL
    1. BCAL Beam Tests 2012
  6. USM update
  7. TDR update
    1. Instructions for the TDR (You must be logged into the wiki to access this page).
    2. We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry.
  8. Simulations/Reconstruction
  9. Any other business
Mini-Bcal mount


Minutes

Attending: