Difference between revisions of "Feb 28, 2012 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 35: Line 35:
 
##* LG gluing schedule and LED attachment by tape
 
##* LG gluing schedule and LED attachment by tape
 
# USM update
 
# USM update
 +
## [https://halldweb1.jlab.org/wiki/images/e/e1/02_28_my_pres_Hall-D.pdf Station 3: Crosstalk vs. temperature (Hayk)]
 
# TDR update
 
# TDR update
 
## [[Private:Instructions for the TDR | Instructions for  the TDR]] (You must be logged into the wiki to access this page).
 
## [[Private:Instructions for the TDR | Instructions for  the TDR]] (You must be logged into the wiki to access this page).

Revision as of 12:10, 28 February 2012

Teleconference Time: 11:00 a.m. EST'

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947


Items for followup from previous meeting(s)

  1. Monitoring
    • Send additional SiPMs to Athens for tests (Elton). Electronics is out for fabrication


Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Monitoring.
  4. FCAL
    1. Construction Status: mechanical, bases (notes from Matt)
      • Paul and I both visited Total Electronics (the vendor for the CW bases) last Thursday. We went through a variety of issues regarding coating and assembly. They appear to understand where their procedure is deficient. Again, they are saying all the right things. The big question is: will the next batch of boards show improvements in production quality? We'll see.
    2. Beam tests in Hall B (John)
      • small note on distance from CLAS scintillators by Kei
  5. BCAL
    1. BCAL Beam Tests 2012
      • LG gluing schedule and LED attachment by tape
  6. USM update
    1. Station 3: Crosstalk vs. temperature (Hayk)
  7. TDR update
    1. Instructions for the TDR (You must be logged into the wiki to access this page).
    2. We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry.
  8. Simulations/Reconstruction
  9. Any other business
Mini-Bcal mount


Minutes

Attending: