Difference between revisions of "Feb 4, 2015 BCAL Commissioning"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 29: Line 29:
 
# Action Items
 
# Action Items
 
# What do we need to do before the spring run?
 
# What do we need to do before the spring run?
#* Verify fixes
+
#* Verify fixes with LED runs
 
#* Humidity settings
 
#* Humidity settings
 +
#* Check channel efficiencies
 +
#* Verify pi0 statistics, estimate amount required
 +
# LED pulser runs
 +
#* Verify fixes to hardware channels
 +
#* Check humidity readback/settings
 +
# Cosmic-Ray runs
 
#* Configuration: DAQ thresholds, Bias voltage setting for SiPMs
 
#* Configuration: DAQ thresholds, Bias voltage setting for SiPMs
 +
#* Can we check efficiencies for a given DAQ threshold?
 +
#* How to effectively use data triggered on the BCAL?
 +
#* How to calibrate timing?
 +
#* What simulations are needed to support calibration?
 
# Any other business
 
# Any other business
  

Revision as of 14:33, 4 February 2015

Video Conferencing Information

Meeting Time: 3:00 p.m. Eastern

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
  3. To join via phone, use one of the following numbers and the Conference ID: 907185247.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6460 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Video-conference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Resources

Action Items

Tentative Agenda

  1. Announcements
  2. Action Items
  3. What do we need to do before the spring run?
    • Verify fixes with LED runs
    • Humidity settings
    • Check channel efficiencies
    • Verify pi0 statistics, estimate amount required
  4. LED pulser runs
    • Verify fixes to hardware channels
    • Check humidity readback/settings
  5. Cosmic-Ray runs
    • Configuration: DAQ thresholds, Bias voltage setting for SiPMs
    • Can we check efficiencies for a given DAQ threshold?
    • How to effectively use data triggered on the BCAL?
    • How to calibrate timing?
    • What simulations are needed to support calibration?
  6. Any other business

Minutes

Attendees: