Difference between revisions of "Feb 4, 2015 BCAL Commissioning"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 32: Line 32:
 
#* Verify fixes with LED runs
 
#* Verify fixes with LED runs
 
#* Humidity settings
 
#* Humidity settings
 +
#* Attempt +5 C?
 
#* Check channel efficiencies
 
#* Check channel efficiencies
 
#* Verify pi0 statistics, estimate amount required
 
#* Verify pi0 statistics, estimate amount required
Line 47: Line 48:
 
#* Automate and enhance scripts to analyze the pulser runs.
 
#* Automate and enhance scripts to analyze the pulser runs.
 
# Cosmic-Ray runs
 
# Cosmic-Ray runs
 +
#* Settings for cosmic runs: shall we match settings for April running?
 
#* Can we check efficiencies for a given DAQ threshold?
 
#* Can we check efficiencies for a given DAQ threshold?
 
#* How to effectively use data triggered on the BCAL?
 
#* How to effectively use data triggered on the BCAL?

Revision as of 15:10, 4 February 2015

Video Conferencing Information

Meeting Time: 3:00 p.m. Eastern

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
  3. To join via phone, use one of the following numbers and the Conference ID: 907185247.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6460 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Video-conference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Resources

Action Items

Tentative Agenda

  1. Announcements
  2. Action Items
  3. What do we need to do before the spring run?
    • Verify fixes with LED runs
    • Humidity settings
    • Attempt +5 C?
    • Check channel efficiencies
    • Verify pi0 statistics, estimate amount required
  4. Parameters
    • DAQ thresholds
    • Bias voltage setting
    • N_sa and N_sb
    • Effective velocity
    • Time offsets
    • Time-walk corrections
  5. LED pulser runs
    • Verify fixes to hardware channels
    • Check humidity readback/settings
    • Create configuration that takes data through the TS for concurrent north and south running
    • Automate and enhance scripts to analyze the pulser runs.
  6. Cosmic-Ray runs
    • Settings for cosmic runs: shall we match settings for April running?
    • Can we check efficiencies for a given DAQ threshold?
    • How to effectively use data triggered on the BCAL?
    • How to calibrate timing?
    • What simulations are needed to support all calibration?
  7. Any other business

Minutes

Attendees: