Difference between revisions of "Feb 8, 2011 Calibration/Monitoring"

From GlueXWiki
Jump to: navigation, search
 
(Tentative Agenda)
Line 20: Line 20:
 
= Tentative Agenda =
 
= Tentative Agenda =
  
 +
# MoU
 
# Discuss Action Items.
 
# Discuss Action Items.
# Review goals/objectives of Monitoring system.
+
# Review goals/objectives of Monitoring system; summary of discussions at Collaboration Meeting
# Presentation to CALWG and Collaboration Meeting.
+
# Presentation to CALWG.
  
 
= Minutes =
 
= Minutes =
  
 
''Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)''
 
''Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)''

Revision as of 15:15, 7 February 2011

Teleconference Time: 09:00 CST (Regina) / 10:00 EST / 17:00 GMT+2 (Athens)

  • ESNET preferred, EVO as a backup

Background information

Action Items

  1. Why was the dynamic range of the APD tested over 20-450? Where there intrinsic limitations? Can it be extended to form a ratio of 400?
  2. Can George calculate the % deviation from linearity on his plot?
  3. Can George verify that the two-setting operation (low bias for near, high bias for far SiPM flashing) is feasible?
  4. What is the approximate power dissipation for each board? (Just LPM since LPCM will be further away).
  5. Zisis will bounce another idea for the one-setting operation mode.
  6. USM should be contacted to send more LGs to Athens (and eventually Regina).

Tentative Agenda

  1. MoU
  2. Discuss Action Items.
  3. Review goals/objectives of Monitoring system; summary of discussions at Collaboration Meeting
  4. Presentation to CALWG.

Minutes

Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)