Difference between revisions of "Feb 9, 2017 Calorimeter"

From GlueXWiki
Jump to: navigation, search
Line 40: Line 40:
 
# BCAL update
 
# BCAL update
 
# Calibrations
 
# Calibrations
##[https://halldweb.jlab.org/wiki/images/f/f0/Ceff_comparison.pdf &pi;<sup>0</sup> Comparing Spring 2016 and Fall 2016 point calibrations] - George
+
##[https://halldweb.jlab.org/wiki/images/f/f0/Ceff_comparison.pdf Comparing Spring 2016 and Fall 2016 point calibrations] - George
 
##[https://halldweb.jlab.org/wiki/images/8/80/Z_track_vs_delta_t.pdf Shifted channels] - George
 
##[https://halldweb.jlab.org/wiki/images/8/80/Z_track_vs_delta_t.pdf Shifted channels] - George
 
# Reconstruction and Simulation
 
# Reconstruction and Simulation

Revision as of 07:32, 9 February 2017

Video Conferencing Information

Meeting Time: 10:00 a.m.

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
  3. To join via phone, use one of the following numbers and the Conference ID: 907185247.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Participant Direct Lines

  • JLab Phone in CC L207 is 757-269-7084 (usual room)
  • JLab Phone: in CC F326 is 757-269-6460
  • Phone in the Regina Video-conference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Action Items

  1. Will and Sean: investigate strange time outputs for BCAL times (cutoff of negative times in TDC, large offsets in ADC) in the Geant/mcsmear.
  2. Elton: check on new pedestal information in data stream.
  3. Marc: Check on "LED noise" on four ADC/TDC channels.

References

  1. FCAL HDFCAL log book
  2. BCAL HDBCAL log book
  3. BCAL Action Items and Working Tasks

Tentative Agenda

  1. Announcements
  2. Collaboration Meeting
    • Please focus the talks on performance, calibration status and Monte Carlo agreement with data.
  3. Action Items
  4. Run preparations
  5. FCAL update
  6. BCAL update
  7. Calibrations
    1. Comparing Spring 2016 and Fall 2016 point calibrations - George
    2. Shifted channels - George
  8. Reconstruction and Simulation
  9. NIM articles
  10. Any other business

Minutes

Attendees: