Difference between revisions of "February 1, 2018 DIRC Optical Box"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
Line 16: Line 16:
 
== Agenda ==
 
== Agenda ==
  
# Optical box
+
# Optical box status
 
#* Status update (Ernie and Jason)
 
#* Status update (Ernie and Jason)
 
#** Box production at Lesker: final production drawings (?)
 
#** Box production at Lesker: final production drawings (?)
Line 22: Line 22:
 
#** Other items and quotes
 
#** Other items and quotes
 
#** Followup on questions to drawing package (postpone to engineering meetings?): [https://www.dropbox.com/s/rvsubsp62145w6x/GLUEX%20FOB%20MK2%20BOX%20WELDMENT%20LH.STEP?dl=0 STEP file]
 
#** Followup on questions to drawing package (postpone to engineering meetings?): [https://www.dropbox.com/s/rvsubsp62145w6x/GLUEX%20FOB%20MK2%20BOX%20WELDMENT%20LH.STEP?dl=0 STEP file]
 +
# Discussion of assembly procedure
 +
#* Detailed proposals to be prepared for the next meeting (2 weeks)

Latest revision as of 08:19, 1 February 2018

Meeting Information

GlueX DIRC Optical Box Meeting
Thursday February 1, 2018
10:00 am, EDT
Hall D Counting House

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Optical box status
    • Status update (Ernie and Jason)
      • Box production at Lesker: final production drawings (?)
      • PMT test fixture
      • Other items and quotes
      • Followup on questions to drawing package (postpone to engineering meetings?): STEP file
  2. Discussion of assembly procedure
    • Detailed proposals to be prepared for the next meeting (2 weeks)