February 12, 2014 Calibration

From GlueXWiki
Revision as of 14:05, 12 February 2014 by Sdobbs (Talk | contribs) (Minutes)

Jump to: navigation, search

Meeting Time and Place

Wednesday January 15, 2013 at 11:00 AM. At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone, dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#

Agenda

  1. Announcements
  2. Status Update
  3. Tracking
  4. Calorimetry
  5. Other systems
    • Photon Beam
    • TOF
    • Start Counter
  6. Simulations and Calibrations

Minutes

Attending: Sean, Amiran (NU); Simon, Elton, Mark, Beni Lubomir

  1. Announcements
    • Sean will give a talk at the CM summarizing the current status of calibrations.
  2. Status Update
    • Constants have been added to the CCDB for all subdetectors except for the Start Counter and Photon Beam. The next step is to identify manpower to update the reconstruction and simulation codes to use these.
  3. Tracking
    • Simon reported slow progress with tracking alignment.
    • Sean got a sample CDC time-to-distance relation from Naomi and added it to the CCDB for testing purposes. The plan is to make these relations for gas mixes between 40/60 and 60/40 and select the appropriate relation at run time.
  4. Calorimetry
  5. Other systems
    • Photon Beam - Richard is scheduled to report on this at the next meeting (2/26)
    • TOF - Work is ongoing based on test data and simulations using a standalone program.
    • Start Counter - Work is ongoing
  6. Simulations and Calibrations