== Minutes ==
 
== Minutes ==
 
* Discussed background of the project and the goal of getting the design completed in a little over a year
 
* Pavel presented the current conceptual design based on his analysis
 
** Copper radiator
 
*** Operate remotely
 
*** 300 micron repeatability
 
*** 2 thicknesses plus blank
 
*** 2cm diameter?
 
*** rad hard materials (no encoder)
 
*** maybe proximity switch/LVDT for positions
 
** Need to develop a complete thermal model as design progresses
 
** Use of a steel core for support
 
** overall alignment of magnet and radiator to be within a few hundred microns
 
** Ability to move the assembly (with out magnets) completely out of the beam to the north wall
 
** Ability to crane or forklift the core out during decommissioning
 
** Total weight approximately 90 tonnes
 
** Need temperature sensors on copper, lead and steel
 
** Need to fine tune the thermal calcs on copper absorber
 
** Need water temperature and flow meters
 
** US magnet to be designed to 2x current plus 10%
 
** Need tungsten block to absorb the electron beam on magnet failure
 
** Consult with Hall C folks on their design experience of a CPS
 
** Josh fine tuning the magnet design
 
*** Moving coils 12cm from beamline
 
*** maybe less steel
 
  
 
== Action Items ==
 
== Action Items ==

Revision as of 16:50, 7 February 2024

Meeting Time and Place

Monday, February 12, 2024, 1pm Hall D Counting House

  • Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard

Agenda

Minutes

Action Items

  • Pavel to check into exporting his model in a compatible format for NX ( Open Scad etc...
  • Stephanie to look into importable files from her end
  • Tim to provide stp file of copper absorber from ANSYS for Designers (complete)
  • Tim to setup bi-weekly meetings
  • Tim to set up and Engineer/Designer detailed meeting