Line 8: Line 8:
 
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_16,_2024_KLONG_CPS_Design_Meeting
 
* Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/January_16,_2024_KLONG_CPS_Design_Meeting
 
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)
 
* Review new basic 3D model and compare to Pavel's model (Pavel, Keith)
** 3D model cross section with dimensions
+
** 3D model cross section with dimensions [[media:Dimensioned CPS cross section.png]]
 
** Possible cross section [[media:Baseline cross section.jpeg]]
 
** Possible cross section [[media:Baseline cross section.jpeg]]
* De-gaussing of Tagger magnet
+
* De-gaussing of Tagger magnet (all)
* Magnet update (Josh)
+
** [[media:tagger_magnet_degaussing_4KLF.pdf | Tagger magnet degaussing requirements]] (Hovanes)
 +
* Magnet update (Josh) [[media:CPS Magnet Design.pdf]]
 
* Discuss path forward (Tim/all)
 
* Discuss path forward (Tim/all)
  
 
== Minutes ==
 
== Minutes ==
 +
* Reviewed minutes from last meeting
 +
* Looked over Keith's 3D model with dimensions
 +
** Pavel to take a closer look to ensure they correspond to his conceptual design
 +
** Need to get accurate dimensions for the 20% Cu/80% W pieces
 +
** Looked at installation in tagger building and discussed space issues
 +
** Need to bring in magnet and girder into the 3D model
 +
** Borated Poly layer is not needed below the CPU
 +
** Outer lead layer may not be needed below the CPU - it may still be needed to prevent concrete activation
 +
** the support stand for the final decommissioning portion (< 10 tons) may be heavy concrete
 +
* Discussed deGauss of tagger magnet, need plan to present to Patrizia by Mar 1
 +
* Josh presented the Magnet spec and design
 +
** Need to verify low power ops (35V) of power supply will be stable enough - Josh to check with Onish
 +
** Start modelling the magnet in NX and making drawings
  
 
== Action Items ==
 
== Action Items ==
 +
* Verify W-Cu piece dimensions (Keith/Pavel)
 +
* Bring in Magnet and upstream girder into the model and move permanent magnet into position (Stephanie/Keith)
 +
* Progress on the detailed mechanical design of the decommissioning portion of CPS and present to Pavel for re-analysis (Keith/Tim)
 +
* Develop concept for shielding on the lower half of the CPS for Pavel to look at (Keith/Tim)
 +
* Start NX 3D magnet design and drawings (Stephanie)
 +
* Get with Onish on Power Supply stability at low power (Josh)
 +
* Get with Joe Meyers on deGauss technique and produce short write up for Patrizia (Tim)
 +
* Determine initial installation plans for CPS components (Josh/Stephanie/Keith/Tim)

Latest revision as of 16:32, 12 February 2024

Meeting Time and Place

Monday, February 12, 2024, 1pm Hall D Counting House

  • Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard

Agenda

Minutes

  • Reviewed minutes from last meeting
  • Looked over Keith's 3D model with dimensions
    • Pavel to take a closer look to ensure they correspond to his conceptual design
    • Need to get accurate dimensions for the 20% Cu/80% W pieces
    • Looked at installation in tagger building and discussed space issues
    • Need to bring in magnet and girder into the 3D model
    • Borated Poly layer is not needed below the CPU
    • Outer lead layer may not be needed below the CPU - it may still be needed to prevent concrete activation
    • the support stand for the final decommissioning portion (< 10 tons) may be heavy concrete
  • Discussed deGauss of tagger magnet, need plan to present to Patrizia by Mar 1
  • Josh presented the Magnet spec and design
    • Need to verify low power ops (35V) of power supply will be stable enough - Josh to check with Onish
    • Start modelling the magnet in NX and making drawings

Action Items

  • Verify W-Cu piece dimensions (Keith/Pavel)
  • Bring in Magnet and upstream girder into the model and move permanent magnet into position (Stephanie/Keith)
  • Progress on the detailed mechanical design of the decommissioning portion of CPS and present to Pavel for re-analysis (Keith/Tim)
  • Develop concept for shielding on the lower half of the CPS for Pavel to look at (Keith/Tim)
  • Start NX 3D magnet design and drawings (Stephanie)
  • Get with Onish on Power Supply stability at low power (Josh)
  • Get with Joe Meyers on deGauss technique and produce short write up for Patrizia (Tim)
  • Determine initial installation plans for CPS components (Josh/Stephanie/Keith/Tim)