* Reviewed minutes from last meeting
 +
* Looked over Keith's 3D model with dimensions
 +
** Pavel to take a closer look to ensure they correspond to his conceptual design
 +
** Need to get accurate dimensions for the 20% Cu/80% W pieces
 +
** Looked at installation in tagger building and discussed space issues
 +
** Need to bring in magnet and girder into the 3D model
 +
** Borated Poly layer is not needed below the CPU
 +
** Outer lead layer may not be needed below the CPU - it may still be needed to prevent concrete activation
 +
** the support stand for the final decommissioning portion (< 10 tons) may be heavy concrete
 +
* Discussed deGauss of tagger magnet, need plan to present to Patrizia by Mar 1
 +
* Josh presented the Magnet spec and design
 +
** Need to verify low power ops (35V) of power supply will be stable enough - Josh to check with Onish
 +
** Start modelling the magnet in NX and making drawings
  
 
== Action Items ==
 
== Action Items ==

Revision as of 16:24, 12 February 2024

Meeting Time and Place

Monday, February 12, 2024, 1pm Hall D Counting House

  • Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard

Agenda

Minutes

  • Reviewed minutes from last meeting
  • Looked over Keith's 3D model with dimensions
    • Pavel to take a closer look to ensure they correspond to his conceptual design
    • Need to get accurate dimensions for the 20% Cu/80% W pieces
    • Looked at installation in tagger building and discussed space issues
    • Need to bring in magnet and girder into the 3D model
    • Borated Poly layer is not needed below the CPU
    • Outer lead layer may not be needed below the CPU - it may still be needed to prevent concrete activation
    • the support stand for the final decommissioning portion (< 10 tons) may be heavy concrete
  • Discussed deGauss of tagger magnet, need plan to present to Patrizia by Mar 1
  • Josh presented the Magnet spec and design
    • Need to verify low power ops (35V) of power supply will be stable enough - Josh to check with Onish
    • Start modelling the magnet in NX and making drawings