Difference between revisions of "February 15, 2013 Installation"

From GlueXWiki
Jump to: navigation, search
Line 1: Line 1:
 
__TOC__
 
__TOC__
 +
 
== Meeting Time and Place ==
 
== Meeting Time and Place ==
 
Friday, February 1, 2013 at 1:30pm  
 
Friday, February 1, 2013 at 1:30pm  
 
At Jefferson Lab, the meeting will be held in ??? F326 ???
 
At Jefferson Lab, the meeting will be held in ??? F326 ???
 +
  
 
== Connections ==
 
== Connections ==
Line 12: Line 14:
 
* International: (303)248-0285 (toll call)  
 
* International: (303)248-0285 (toll call)  
 
* enter access code followed by the # sign: 3421244#<br/>
 
* enter access code followed by the # sign: 3421244#<br/>
 +
 +
Up to [[Hall-D_Installation_Meetings]]
  
  
Line 20: Line 24:
 
# Beni agreed to create a <i>shopping list</i> for the CDC of items that would be needed at CMU to carry out a test involving between 3 and 7 125MhZ Flash ADCs. This would include low- and high- voltage systems as well as the Flash modules.
 
# Beni agreed to create a <i>shopping list</i> for the CDC of items that would be needed at CMU to carry out a test involving between 3 and 7 125MhZ Flash ADCs. This would include low- and high- voltage systems as well as the Flash modules.
 
# We will ask at the Wednesday meeting about groups sending manpower to Jefferson Lab.
 
# We will ask at the Wednesday meeting about groups sending manpower to Jefferson Lab.
# The next installation meeting will be on Monday December 10 at 1:30pm.
+
 
  
 
== Agenda ==
 
== Agenda ==
Line 29: Line 33:
 
## In which areas do we need coordination?
 
## In which areas do we need coordination?
 
## What are urgent tasks?
 
## What are urgent tasks?
 +
  
 
== Minutes ==
 
== Minutes ==

Revision as of 12:53, 31 January 2013

Meeting Time and Place

Friday, February 1, 2013 at 1:30pm At Jefferson Lab, the meeting will be held in ??? F326 ???


Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone (supported on request only) dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#

Up to Hall-D_Installation_Meetings


Action Items From Last Fall

  1. Tim and Eugene will complete the installation schedule for the Lehman review and this will form the basis of our installation schedule.
  2. Curtis will ask everyone delivering a detector component to JLab to write down what they see occuring from the time the detector is delivered until it is installed an cabled up.
  3. Beni agreed to create a shopping list for the CDC of items that would be needed at CMU to carry out a test involving between 3 and 7 125MhZ Flash ADCs. This would include low- and high- voltage systems as well as the Flash modules.
  4. We will ask at the Wednesday meeting about groups sending manpower to Jefferson Lab.


Agenda

  1. Announcements
  2. Review of Last Recorded Action Items
  3. Status Reports from Participating Teams
    1. In which areas do we need coordination?
    2. What are urgent tasks?


Minutes