February 15, 2013 Installation

From GlueXWiki
Revision as of 12:51, 31 January 2013 by Mashephe (Talk | contribs)

Jump to: navigation, search

Meeting Time and Place

Friday, February 1, 2013 at 1:30pm At Jefferson Lab, the meeting will be held in ??? F326 ???

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone (supported on request only) dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#


Action Items From Last Fall

  1. Tim and Eugene will complete the installation schedule for the Lehman review and this will form the basis of our installation schedule.
  2. Curtis will ask everyone delivering a detector component to JLab to write down what they see occurring from the time the detector is delivered until it is installed an cabled up.
  3. Beni agreed to create a shopping list for the CDC of items that would be needed at CMU to carry out a test involving between 3 and 7 125MhZ Flash ADCs. This would include low- and high- voltage systems as well as the Flash modules.
  4. We will ask at the Wednesday meeting about groups sending manpower to Jefferson Lab.
  5. The next installation meeting will be on Monday December 10 at 1:30pm.

Agenda

  1. Announcements
  2. Review of Last Recorded Action Items
  3. Status Reports from Participating Teams
    1. In which areas do we need coordination?
    2. What are urgent tasks?

Minutes