Difference between revisions of "February 24, 2012 Design Meeting"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 10: | Line 10: | ||
* CAD update | * CAD update | ||
* Overall status from collaboration meeting [[Media:Feb_Status.pdf]] | * Overall status from collaboration meeting [[Media:Feb_Status.pdf]] | ||
− | + | * FDC construction update | |
− | * FDC construction update | + | |
* Tagger update | * Tagger update | ||
* Target update | * Target update | ||
Line 19: | Line 18: | ||
* Controls | * Controls | ||
* Engineering tools folder M:\halld_engineering\engineering tools | * Engineering tools folder M:\halld_engineering\engineering tools | ||
+ | * FDC installation tooling | ||
* Installation Schedule [[Media:SAD_Installation1.pdf]] | * Installation Schedule [[Media:SAD_Installation1.pdf]] | ||
* Piping systems B31.3 vs B31.9 [[Media:B31-3_vs_B31-9.pdf]] | * Piping systems B31.3 vs B31.9 [[Media:B31-3_vs_B31-9.pdf]] | ||
==Outstanding Action Items== | ==Outstanding Action Items== |
Revision as of 16:49, 23 February 2012
Friday Feb 24, 2012 at 8:15am At Jefferson Lab, the meeting will be held in room ARC 231
Agenda
- ESH&Q minute - Pressure systems
- Announcements
- Health plan open enrollment closes next week
- Space - 4th floor in March Media:floor-plan_4th_floor.pdf
- CAD update
- Overall status from collaboration meeting Media:Feb_Status.pdf
- FDC construction update
- Tagger update
- Target update
- Electrical - Giles
- Platforms
- Solenoid interface
- Controls
- Engineering tools folder M:\halld_engineering\engineering tools
- FDC installation tooling
- Installation Schedule Media:SAD_Installation1.pdf
- Piping systems B31.3 vs B31.9 Media:B31-3_vs_B31-9.pdf