Difference between revisions of "February 24, 2012 Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
  
 
== Agenda ==
 
== Agenda ==
* ESH&Q minute - Pressure systems
+
* ESH&Q minute - Paul?
 +
** Manager's Safety mtg http://www.jlab.org/memo/2012_managers_meeting.html.
 +
** Pressure systems https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-1414
 
* Announcements  
 
* Announcements  
 
** Health plan open enrollment closes next week
 
** Health plan open enrollment closes next week
Line 20: Line 22:
 
* FDC installation tooling
 
* FDC installation tooling
 
* Installation Schedule [[Media:SAD_Installation1.pdf]]
 
* Installation Schedule [[Media:SAD_Installation1.pdf]]
 +
* Engineering tasks M:\halld_engineering\Manpower-schedule
 
* Piping systems B31.3 vs B31.9 [[Media:B31-3_vs_B31-9.pdf]]
 
* Piping systems B31.3 vs B31.9 [[Media:B31-3_vs_B31-9.pdf]]
  
 
==Outstanding Action Items==
 
==Outstanding Action Items==

Latest revision as of 08:46, 24 February 2012

Friday Feb 24, 2012 at 8:15am At Jefferson Lab, the meeting will be held in room ARC 231

Agenda

  • CAD update
  • Overall status from collaboration meeting Media:Feb_Status.pdf
  • FDC construction update
  • Tagger update
  • Target update
  • Electrical - Giles
  • Platforms
  • Solenoid interface
  • Controls
  • Engineering tools folder M:\halld_engineering\engineering tools
  • FDC installation tooling
  • Installation Schedule Media:SAD_Installation1.pdf
  • Engineering tasks M:\halld_engineering\Manpower-schedule
  • Piping systems B31.3 vs B31.9 Media:B31-3_vs_B31-9.pdf

Outstanding Action Items