(→Agenda) |
(→Agenda) |
||
Line 22: | Line 22: | ||
* FDC installation tooling | * FDC installation tooling | ||
* Installation Schedule [[Media:SAD_Installation1.pdf]] | * Installation Schedule [[Media:SAD_Installation1.pdf]] | ||
+ | * Engineering tasks M:\halld_engineering\Manpower-schedule | ||
* Piping systems B31.3 vs B31.9 [[Media:B31-3_vs_B31-9.pdf]] | * Piping systems B31.3 vs B31.9 [[Media:B31-3_vs_B31-9.pdf]] | ||
==Outstanding Action Items== | ==Outstanding Action Items== |
Latest revision as of 08:46, 24 February 2012
Friday Feb 24, 2012 at 8:15am At Jefferson Lab, the meeting will be held in room ARC 231
Agenda
- ESH&Q minute - Paul?
- Manager's Safety mtg http://www.jlab.org/memo/2012_managers_meeting.html.
- Pressure systems https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-1414
- Announcements
- Health plan open enrollment closes next week
- Space - 4th floor in March Media:floor-plan_4th_floor.pdf
- CAD update
- Overall status from collaboration meeting Media:Feb_Status.pdf
- FDC construction update
- Tagger update
- Target update
- Electrical - Giles
- Platforms
- Solenoid interface
- Controls
- Engineering tools folder M:\halld_engineering\engineering tools
- FDC installation tooling
- Installation Schedule Media:SAD_Installation1.pdf
- Engineering tasks M:\halld_engineering\Manpower-schedule
- Piping systems B31.3 vs B31.9 Media:B31-3_vs_B31-9.pdf