February 25, 2021 CPP Design Meeting/ERR discussion

From GlueXWiki
Revision as of 11:03, 18 March 2021 by Whitey (Talk | contribs) (Minutes and Action Items)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Meeting Time and Place

Thursday Feb 18, 2021, 2pm Bluejeans https://bluejeans.com/465620466

  • Present - Elton, Dave, Stephanie, Ilya, Rory, Mark S, Beni, Simon

Agenda

  • Gas system Bubblers - Beni has some
  • Design/Procurement status
  • Things to work out
    • Gas line manifold/bubblers
    • Complete structural analysis
    • Develop Detailed installation plan
    • Develop Design/operational/Maintenance Requirements
    • Modified US vacuum system
    • Solid target installation
    • Documentation for ERR
    • Microscope move

Minutes and Action Items

  • Rory presented mod to orientation of MWPCs - US-DS VHVHVV (last 2 vertical)
    • Stephanie will modify 3D model
    • Move Microscope 2.65M DS (just to vacuum chamber support stand)
  • There are joints in the lead, both o degrees and 45 degrees
    • Stephanie to send Lead configuration to Ilya for analysis