(Created page with "= Meeting Time and Place == Wednesday February 26, 11:00am At Jefferson Lab, room TED 2504 * Present - Sasha Somov, Josh Crafts, Eugene, Stephanie, Keith Harding, Tim, Fernan...")
 
(Agenda)
Line 31: Line 31:
 
** use 25um brass straps
 
** use 25um brass straps
 
** 350 um mu metal
 
** 350 um mu metal
** additional 100um mu metal inside
+
** additional 50um mu metal inside
 
** separate by 25um kapton
 
** separate by 25um kapton
  
Line 64: Line 64:
 
** Machine Rohacell to measured size
 
** Machine Rohacell to measured size
 
** Pre-assemble acrylic/fibers/Rohacel before installation
 
** Pre-assemble acrylic/fibers/Rohacel before installation
 
 
  
 
== Minutes and Action Items ==
 
== Minutes and Action Items ==

Revision as of 08:36, 26 February 2020

Meeting Time and Place =

Wednesday February 26, 11:00am At Jefferson Lab, room TED 2504

  • Present - Sasha Somov, Josh Crafts, Eugene, Stephanie, Keith Harding, Tim, Fernando, Chris Stanislav

Agenda

  • Initial design substantially complete
    • Drawing Package in check (most)
    • 3D Model complete (except details to be discussed below)
  • Discuss Tungsten absorber
    • Cover 1.5 crystals ok?
    • Rohacell supported
  • Monitoring System
    • Testing plan?
    • 1mm fibers - Josh has them
    • 15cm square with 6mm 45 degree bevel - 2 pieces made
    • Diamond end mill procured
  • Electronics/Cabling
    • Use HV and signal patch panels inside dark room, any details?
    • HV cables are 48 wire with PCB mounted connector
    • 1600 signal connectors on patch panels
    • Heat load for new bases?
  • Design Requirements/Specs
  • Crystal Array
    • Crystals, 2.05cm square, 20cm long
    • Design for 40 x 40 array with ability to go 32 x 32
    • 2 x 2 crystal hole with annealed steel insert, 2mm wall, 3.8cm ID
    • Inset crystals 12.5cm DS of Lead glass blocks
    • use 25um brass straps
    • 350 um mu metal
    • additional 50um mu metal inside
    • separate by 25um kapton
  • Tungsten Absorber
    • 6 cm thick
    • cover 1.5 crystals?
    • Support on rohacell, align to center tube
  • Monitoring
    • 1/2" acrylic sheet
    • 6mm x 45° beveled edge
    • LED/ 1mm fiber input through Rohacell
    • Total number of fibers = ?
    • Gasket between module end and acrylic to reduce cross talk
  • Cooling
    • Design for 10°C
    • 2.1 KW needed? Maybe more if new bases are 1W each - 2 chillers?
    • 11 parallel circuits for each chiller
    • 2 manifolds (BL, BR)
    • potted copper tubes into aluminum conduction cooling blocks
    • Cooling of center tube needed and to be removable
    • Entire Dark room is an insulated freezer
    • De-humidification needed
    • Air/water heat exchangers (4x)
  • Assembly Media:FCAL Insert Module installation procedure.pdf
    • Measure existing FCAL geometry before removing
    • Measure stacks of crystals before assy
    • 19 lead glass blocks surround crystals on each side
    • Determine qty and location of aluminum shims
    • Machine Rohacell to measured size
    • Pre-assemble acrylic/fibers/Rohacel before installation

Minutes and Action Items