* Engineering group to meet separately to progress the detail design of the "decommissioning" section (Tim)
 +
* Josh and Stephanie to continue detail magnet design
 +
* 3D print the copper absorber to ensure we have the geometry correct (Keith/Bobby)
 +
* Run thermal models of the updated absorber geometry (Hovanes/Tim)
 +
* Develop plan for testing the deGauss procedure with Magnet measurement group and send email to Patrizia (Tim)

Revision as of 12:58, 8 March 2024

Meeting Time and Place

Monday, February 27, 2024, 1pm Hall D Counting House

  • Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard

Agenda

Minutes

  • Looked at 3D model and discussed the copper absorber geometry and hall layout
  • Decided it would be a good idea to 3D print the absorber to ensure we have the correct geometry and recheck thermal models
  • The "decommissioning" volume (<10tons) was discussed and possible plans include pre assembly outside tagger hall or assemble in place
  • Discussed the deGaussing of the tagger and need for reply to Patricia by March 1. The plan is to work with magnet measurement group to set up a test of a similar dipole to develop the method.
  • Discussed magnet design progress, Josh and Stephanie are working on details including the coil design

Action Items

  • Engineering group to meet separately to progress the detail design of the "decommissioning" section (Tim)
  • Josh and Stephanie to continue detail magnet design
  • 3D print the copper absorber to ensure we have the geometry correct (Keith/Bobby)
  • Run thermal models of the updated absorber geometry (Hovanes/Tim)
  • Develop plan for testing the deGauss procedure with Magnet measurement group and send email to Patrizia (Tim)