Difference between revisions of "February 29, 2008 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(DRAFT Agenda)
Line 17: Line 17:
 
# Input to the DC and PID Review
 
# Input to the DC and PID Review
 
#* Timing for tof measurements (charged tracks)
 
#* Timing for tof measurements (charged tracks)
 +
#** I suggest we use 200 ps for mip timing resolution. Note from cosmics: sigma(cell)=425 ps -> sigma(mip)=425/sqrt(6) = 175 ps. (Consistent with Alex's plot).
 
#* [http://dustbunny.physics.indiana.edu/~dzierba/Leap/ARD_Kinem.pdf See the last  slide of this talk on charged particle kinematics by Alex]
 
#* [http://dustbunny.physics.indiana.edu/~dzierba/Leap/ARD_Kinem.pdf See the last  slide of this talk on charged particle kinematics by Alex]
 
# [[Private:Fiber Specs | Fiber Specifications]]
 
# [[Private:Fiber Specs | Fiber Specifications]]

Revision as of 09:52, 29 February 2008

Connection

  • The meeting will be held at 10:00 EST (9:00 CST)
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Reference Documents

  1. Previous minutes: January 25, 2008 Calorimetry
  2. Schedule, Tracker and Drawings (gluex pass)

DRAFT Agenda

  1. Input to the DC and PID Review
  2. Fiber Specifications
  3. FCAL Update
  4. BCAL Update
  5. Calibration Update / Discussion
    • Goals for calibration
    • Deployment in various subsystems
  6. Any other business

Minutes