Difference between revisions of "February 29, 2008 Calorimetry"
From GlueXWiki
(→DRAFT Agenda) |
|||
Line 17: | Line 17: | ||
# Input to the DC and PID Review | # Input to the DC and PID Review | ||
#* Timing for tof measurements (charged tracks) | #* Timing for tof measurements (charged tracks) | ||
+ | #** I suggest we use 200 ps for mip timing resolution. Note from cosmics: sigma(cell)=425 ps -> sigma(mip)=425/sqrt(6) = 175 ps. (Consistent with Alex's plot). | ||
#* [http://dustbunny.physics.indiana.edu/~dzierba/Leap/ARD_Kinem.pdf See the last slide of this talk on charged particle kinematics by Alex] | #* [http://dustbunny.physics.indiana.edu/~dzierba/Leap/ARD_Kinem.pdf See the last slide of this talk on charged particle kinematics by Alex] | ||
# [[Private:Fiber Specs | Fiber Specifications]] | # [[Private:Fiber Specs | Fiber Specifications]] |
Revision as of 09:52, 29 February 2008
Connection
- The meeting will be held at 10:00 EST (9:00 CST)
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Reference Documents
- Previous minutes: January 25, 2008 Calorimetry
- Schedule, Tracker and Drawings (gluex pass)
DRAFT Agenda
- Input to the DC and PID Review
- Timing for tof measurements (charged tracks)
- I suggest we use 200 ps for mip timing resolution. Note from cosmics: sigma(cell)=425 ps -> sigma(mip)=425/sqrt(6) = 175 ps. (Consistent with Alex's plot).
- See the last slide of this talk on charged particle kinematics by Alex
- Timing for tof measurements (charged tracks)
- Fiber Specifications
- Fiber measurements (JLab and Regina)
- BCAL Scintillating Fiber Emission Spectra Analysis - Alex, George and Zisis
- Work in progress - new emission spectra measurements and analysis.
- FCAL Update
- BCAL Update
- Calibration Update / Discussion
- Goals for calibration
- Deployment in various subsystems
- Any other business