Difference between revisions of "February 3, 2020 DIRC"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Monday February 3, 2029<br> 1:00 pm, EDT<br> CC F326 <br> == Connection Using Bluejeans == # To join via Polycom room system...")
 
 
(6 intermediate revisions by 3 users not shown)
Line 3: Line 3:
 
Monday February 3, 2029<br>
 
Monday February 3, 2029<br>
 
1:00 pm, EDT<br>
 
1:00 pm, EDT<br>
CC F326 <br>
+
CC A110 <br>
  
 
== Connection Using Bluejeans ==
 
== Connection Using Bluejeans ==
Line 17: Line 17:
  
 
# Announcements:
 
# Announcements:
 +
#* Late [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4319 DIRC2019 proceedings].  Please send feedback ASAP.
 
# Issues with the ongoing run:
 
# Issues with the ongoing run:
#* North OB fiber 2: change with atmospheric pressure (Bill)
+
#* [https://halldweb.jlab.org/DocDB/0035/003581/002/2020_Feb_03_DIRC_meeting.pdf North OB fiber 2: change with atmospheric pressure] (Bill)
 
# 2019 commissioning analyses
 
# 2019 commissioning analyses
 
#* [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All)
 
#* [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All)
Line 26: Line 27:
 
#** DIRC LED skims: /volatile/halld/home/gxproj7/RunPeriod-2019-11/dirc_monitoring/ver01/DIRC-LED/
 
#** DIRC LED skims: /volatile/halld/home/gxproj7/RunPeriod-2019-11/dirc_monitoring/ver01/DIRC-LED/
 
#** REST files: /volatile/halld/home/gxproj7/RunPeriod-2019-11/dirc_monitoring/ver01/REST/
 
#** REST files: /volatile/halld/home/gxproj7/RunPeriod-2019-11/dirc_monitoring/ver01/REST/
<!--
 
#* New simulation samples (100M events each): various job failures that Justin is still tracking down:
 
#** Samples for both Spring 2019 (commissioning) and Fall 2019 (borosilicate mirrors) will be produced
 
-->
 
 
#* Commissioning analyses (All)
 
#* Commissioning analyses (All)
#* Standalone LUT update (Ahmed/Roman)  
+
#* Standalone LUT update (Ahmed/Roman) https://halldweb.jlab.org/wiki/images/4/48/Gluex_DIRC_feb_2020_1_pdf.pdf
 
#* FastDIRC update (Yunjie)
 
#* FastDIRC update (Yunjie)
 
# High level observables: for run-by-run comparisons and bar/x position binning over DIRC plane (All)
 
# High level observables: for run-by-run comparisons and bar/x position binning over DIRC plane (All)

Latest revision as of 00:43, 29 February 2020

Meeting Information

GlueX DIRC Meeting
Monday February 3, 2029
1:00 pm, EDT
CC A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements:
  2. Issues with the ongoing run:
  3. 2019 commissioning analyses
  4. High level observables: for run-by-run comparisons and bar/x position binning over DIRC plane (All)
    • Photon yield: reflected, direct, total
    • θC resolution: single-photon resolution, per-track resolution (from histogram fits)
    • Timing resolution: reflected, direct
    • FastDIRC: ΔX and ΔY resolution
  5. AOB