Difference between revisions of "February 5, 2019 DIRC"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Monday February 5, 2019<br> 1:00 pm, EDT<br> JLab Hall D counting house <br> == Connection Using Bluejeans == # To join via...")
 
(Agenda)
Line 24: Line 24:
 
#* LED data analysis (All)
 
#* LED data analysis (All)
 
#* Additional LED datasets this week?
 
#* Additional LED datasets this week?
 +
#* Simulations to generate ASAP?
 
# Software/simulations
 
# Software/simulations
 
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
 
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)

Revision as of 11:16, 4 February 2019

Meeting Information

GlueX DIRC Meeting
Monday February 5, 2019
1:00 pm, EDT
JLab Hall D counting house

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Installation status (All)
    • Summary of installation and survey results (Tim, All)
  3. Spring 2019 DIRC Commissioning (All)
    • Laser test stand calibration analysis (All)
    • LED data analysis (All)
    • Additional LED datasets this week?
    • Simulations to generate ASAP?
  4. Software/simulations
    • Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
    • Time-based studies and adding # photons to LUT likelihood (Maria)
    • Alignment updates (Cris)
    • Software overview and tasks (All)
      • All software for commissioning now on master branch.
  5. AOB