Difference between revisions of "February 5, 2019 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 22: Line 22:
 
# [[Spring 2019 DIRC Commissioning]] (All)
 
# [[Spring 2019 DIRC Commissioning]] (All)
 
#* Laser test stand calibration analysis and threshold scan analysis (All)
 
#* Laser test stand calibration analysis and threshold scan analysis (All)
#** Efficiency map in detector coordinates
+
#** [[Efficiency map in detector coordinates:EfficMap.pdf]] and [[normalized LED data:normalized.pdf]]
#** Gain map in detector coordinates
+
#** [[Gain map in detector coordinates:GainMap.pdf]]
#** DAC threshold scan in detector coordinates
+
#** [[DAC threshold scan in detector coordinates:PedestalMeanMap.pdf]]
 
#* LED data analysis (All)
 
#* LED data analysis (All)
 
#* Additional LED datasets this week?
 
#* Additional LED datasets this week?

Revision as of 12:08, 5 February 2019

Meeting Information

GlueX DIRC Meeting
Monday February 5, 2019
1:00 pm, EDT
JLab Hall D counting house

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Installation status (All)
    • Summary of installation and survey results (Tim, All)
  3. Spring 2019 DIRC Commissioning (All)
  4. Software/simulations
    • Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
    • Time-based studies and adding # photons to LUT likelihood (Maria)
    • Alignment updates (Cris)
    • Software overview and tasks (All)
      • All software for commissioning now on master branch.
  5. AOB