Difference between revisions of "February 5, 2019 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 27: | Line 27: | ||
#* LED data analysis (All) | #* LED data analysis (All) | ||
#** Data already through RootSpy and offline monitoring on [https://halldweb.jlab.org/data_monitoring/Plot_Browser.html PlotBrowser] | #** Data already through RootSpy and offline monitoring on [https://halldweb.jlab.org/data_monitoring/Plot_Browser.html PlotBrowser] | ||
+ | #** [https://halldweb.jlab.org/wiki/images/2/20/Dirc_050119.pdf Threshold scan + T0 time] | ||
#* Additional LED datasets this week? | #* Additional LED datasets this week? | ||
#* Simulations to generate ASAP? | #* Simulations to generate ASAP? |
Revision as of 13:48, 5 February 2019
Meeting Information
GlueX DIRC Meeting
Monday February 5, 2019
1:00 pm, EDT
JLab Hall D counting house
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Installation status (All)
- Summary of installation and survey results (Tim, All)
- Spring 2019 DIRC Commissioning (All)
- Laser test stand calibration analysis and threshold scan analysis (All)
- LED data analysis (All)
- Data already through RootSpy and offline monitoring on PlotBrowser
- Threshold scan + T0 time
- Additional LED datasets this week?
- Simulations to generate ASAP?
- Software/simulations
- AOB