# Installation status (All)
 
# Installation status (All)
 
#* Summary of installation and survey results (Tim, All)
 
#* Summary of installation and survey results (Tim, All)
 +
#* [https://logbooks.jlab.org/book/HDDIRC Logbook]: light tightening bar boxes, etc.
 
# [[Spring 2019 DIRC Commissioning]] (All)
 
# [[Spring 2019 DIRC Commissioning]] (All)
#* Laser test stand calibration analysis (All)
+
#* Laser test stand calibration analysis and threshold scan analysis (All)
 +
#** [https://halldweb.jlab.org/wiki/images/f/fb/EfficMap.pdf Efficiency map in detector coordinates] and [https://halldweb.jlab.org/wiki/images/9/98/Normalized.pdf normalized LED occupancy]
 +
#** [https://halldweb.jlab.org/wiki/images/b/b9/GainMap.pdf Gain map in detector coordinates]
 +
#** [https://halldweb.jlab.org/wiki/images/4/46/PedMeanMap.pdf DAC threshold scan in detector coordinates]
 
#* LED data analysis (All)
 
#* LED data analysis (All)
 +
#** Data already through RootSpy and offline monitoring on [https://halldweb.jlab.org/data_monitoring/Plot_Browser.html PlotBrowser]
 +
#** [https://halldweb.jlab.org/wiki/images/2/20/Dirc_050119.pdf Threshold scan + T0 time]
 
#* Additional LED datasets this week?
 
#* Additional LED datasets this week?
 
#* Simulations to generate ASAP?
 
#* Simulations to generate ASAP?

Latest revision as of 14:00, 5 February 2019

Meeting Information

GlueX DIRC Meeting
Monday February 5, 2019
1:00 pm, EDT
JLab Hall D counting house

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Installation status (All)
    • Summary of installation and survey results (Tim, All)
    • Logbook: light tightening bar boxes, etc.
  3. Spring 2019 DIRC Commissioning (All)
  4. Software/simulations
    • Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
    • Time-based studies and adding # photons to LUT likelihood (Maria)
    • Alignment updates (Cris)
    • Software overview and tasks (All)
      • All software for commissioning now on master branch.
  5. AOB