Difference between revisions of "February 8, 2018 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 31: | Line 31: | ||
#** Followup on questions to drawing package (postpone to engineering meetings?): [https://www.dropbox.com/s/rvsubsp62145w6x/GLUEX%20FOB%20MK2%20BOX%20WELDMENT%20LH.STEP?dl=0 STEP file] | #** Followup on questions to drawing package (postpone to engineering meetings?): [https://www.dropbox.com/s/rvsubsp62145w6x/GLUEX%20FOB%20MK2%20BOX%20WELDMENT%20LH.STEP?dl=0 STEP file] | ||
# Simulation studies (Maria and Roman) | # Simulation studies (Maria and Roman) | ||
− | # MAPMT testing (Bill) | + | # MAPMT testing (Bill) [https://drive.google.com/file/d/12DI9R70Eh-s3EepLDWzZ_PPk4bvdDgPQ/view?usp=sharing update] |
# AOB | # AOB |
Revision as of 10:38, 8 February 2018
Meeting Information
GlueX DIRC Meeting
Thursday February 8, 2018
10:00 am, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Support structure update (John, Tim, Tom)
- Roll fixture testing
- Bar box transportation
- Discussion of proposed dates
- Optical box
- Status update (Ernie and Jason)
- Box production at Lesker: final production drawings (?)
- PMT test fixture
- 3D Model status
- Other items and quotes
- Followup on questions to drawing package (postpone to engineering meetings?): STEP file
- Status update (Ernie and Jason)
- Simulation studies (Maria and Roman)
- MAPMT testing (Bill) update
- AOB