Difference between revisions of "GlueX-II and DIRC ERR"
From GlueXWiki
Line 1: | Line 1: | ||
Experimental Readiness Review for Gluex-II high intensity and the DIRC | Experimental Readiness Review for Gluex-II high intensity and the DIRC | ||
− | + | == Monday June 25, 2018 == | |
− | + | ||
* [[Media:DIRC_GlueX-II_ERR_Charge.pdf|Charge]] | * [[Media:DIRC_GlueX-II_ERR_Charge.pdf|Charge]] | ||
+ | * Agenda (TBD) | ||
+ | * Proposals and reviews: | ||
+ | ** [https://www.jlab.org/exp_prog/proposals/13/PR12-13-003.pdf Approved proposal at PAC40 (High Intensity)] | ||
+ | ** [https://www.jlab.org/exp_prog/proposals/14/C12-12-002.pdf Approved proposal at PAC42 (High Intensity + DIRC)] | ||
+ | ** [[2015_October_14_DIRC_Project_Review | DIRC Capital Equipment Project Review (October 2015) ]] | ||
+ | ** [[May_11_High_Intensity_Review | High Intensity Review (May 2017) ]] | ||
+ | * Pre-brief material: | ||
+ | ** Safety documentation | ||
+ | ** Computing requirements | ||
+ | |||
+ | * Presentations: | ||
+ | ** DIRC project: overview and status (30+15) --- Justin Stevens | ||
+ | ** DIRC installation - schedule and EHS&Q (30+15) --- Tim Whitlatch | ||
+ | ** GlueX at high intensity: 50MHz in the peak (30+15) --- David Lawrence |
Revision as of 10:47, 18 May 2018
Experimental Readiness Review for Gluex-II high intensity and the DIRC
Monday June 25, 2018
- Charge
- Agenda (TBD)
- Proposals and reviews:
- Pre-brief material:
- Safety documentation
- Computing requirements
- Presentations:
- DIRC project: overview and status (30+15) --- Justin Stevens
- DIRC installation - schedule and EHS&Q (30+15) --- Tim Whitlatch
- GlueX at high intensity: 50MHz in the peak (30+15) --- David Lawrence