Difference between revisions of "GlueX Data Challenge Meeting, February 7, 2014"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 2: Line 2:
 
Friady, February 7, 2014<br>
 
Friady, February 7, 2014<br>
 
11:30 pm, EST<br>
 
11:30 pm, EST<br>
JLab: CEBAF Center, A110<br>
+
JLab: CEBAF Center, F326/7<br>
 
ESNet: 8542553<br>
 
ESNet: 8542553<br>
 
ReadyTalk: (866)740-1260, access code: 1833622<br>
 
ReadyTalk: (866)740-1260, access code: 1833622<br>

Revision as of 15:26, 6 February 2014

GlueX Data Challenge Meeting
Friady, February 7, 2014
11:30 pm, EST
JLab: CEBAF Center, F326/7
ESNet: 8542553
ReadyTalk: (866)740-1260, access code: 1833622
ReadyTalk desktop: http://esnet.readytalk.com/ , access code: 1833622

Agenda

  1. Announcements
  2. Agreed upon parameters.
    • Nominal goal is 10 billion events.
    • Phythia/BGGEN events from 7.0GeV to the endpoint.
    • Normal run will be in REST format.
    • Specialized block (at JLab) that retains HDGEANT output (for tape tests)?
    • Target distribution to be nominal LH2 as handled by HDGEANT.
    • srm servers at UCONN and NWU will receive grid events?
    • Jlab events will be written at JLAB.
    • CMU events will be written at CMU.
  3. Status of Preparations
    • Update on phi=0 geometry issues in CDC? Simon/Richard
    • Random number seeds procedure? Mark/Anyone
    • Electromagnetic Backgrounds update. Kei
    • Check on event genealogy. Kei
    • JLab CC is ready, what do we need to tell them. Mark
    • Preparations of standard distribution/scripts Mark/Richard/Sean
    • 100-job tests at various sites. Jlab/Grid/CMU,NWU, ....
  4. Open Stack Overview
  5. Proposed Schedule
    • Launch of Data Challenge Thursday Feb.27, 2014 (est.).
    • Test jobs going successfully by Tuesday February 25.
    • Distribution ready by Monday February 24.
  6. AOT