Difference between revisions of "GlueX Offline Meeting, April 18, 2012"

From GlueXWiki
Jump to: navigation, search
m
(notes as minutes)
Line 34: Line 34:
  
 
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2012-2Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-2Q/ .
 
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2012-2Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-2Q/ .
 +
 +
=Minutes=
 +
 +
Present:
 +
simon, mark, elliott, irina
 +
matt, ryan, kei
 +
will, paul
 +
 +
announcements
 +
 +
evio version 4 is out
 +
unification of files, buffers, sockets
 +
details are hidden
 +
dictionaries have been added
 +
 +
new C++ standard
 +
current compilers have special namespaces
 +
boost, tr1
 +
shared_ptr
 +
head's up
 +
 +
calorimeters
 +
physcis meeting, minimum blocks needed for form cluster
 +
make the default 1
 +
change not made yet
 +
richard suggested threshold change
 +
 +
one cluster hits with loose timing cut Will will implement
 +
 +
bcal meeting last week irina and andre, discussion on how to incorporate sampling fluctuations into simulation
 +
more discussion
 +
single block, not layers
 +
 +
tracking
 +
 +
fdc segment code changed ot get target z position and lentgh from xml
 +
 +
matt tells reason for 65 was prevent
 +
 +
busy events cdc track candidate purious matches between layers 1 and 5 with nothing in 3
 +
 +
paul working on spiraling pions, going well, code running, doing tests, problem cases dealing with them
 +
 +
add a dpi+ and dpi- factory for each of those for convenience
 +
 +
committee has been named, chair
 +
no charge yet
 +
data acquisition added
 +
mcbride, mchaus, marchand, perske
 +
with another from babar and/or cleo
 +
discussions with chair
 +
understood how much work it takes to utilitze grid
 +
need to have numbers
 +
outlines of slides have been done
 +
intro curtis, cpu requirements, mark
 +
parallel, with hall b for two hours,
 +
40 minutes of slides anyway,
 +
another meeting next week with rolf
 +
june 7 & 8
 +
outline of document for TDR/hand-out

Revision as of 09:19, 20 April 2012

GlueX Offline Software Meeting
Wednesday, April 18, 2012
1:30 pm EDT
JLab: CEBAF Center, F326/327

Agenda

  1. Announcements
    1. EVIO version 4
    2. std::shared_ptr<>() and new C++ standard
  2. Review of minutes from the last meeting: all
  3. Reconstruction sub-group reports
    1. Calorimeters
    2. Tracking
      1. Tracking/FDC Segment code changed to read target z-position and length from XML geometry (before: z-position was hard-coded to 65.0 cm)
      2. CDC Candidate factory: no longer produces spurious matches between axial layers 1 and 5 when there are no matching hits in layer 3
    3. PID
  4. Offline Software Review Planning
  5. Action Item Review
  6. Review of recent repository activity: all

Communication Information

Video Conferencing

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-2Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-2Q/ .

Minutes

Present: simon, mark, elliott, irina matt, ryan, kei will, paul

announcements

evio version 4 is out unification of files, buffers, sockets details are hidden dictionaries have been added

new C++ standard current compilers have special namespaces boost, tr1 shared_ptr head's up

calorimeters physcis meeting, minimum blocks needed for form cluster make the default 1 change not made yet richard suggested threshold change

one cluster hits with loose timing cut Will will implement

bcal meeting last week irina and andre, discussion on how to incorporate sampling fluctuations into simulation more discussion single block, not layers

tracking

fdc segment code changed ot get target z position and lentgh from xml

matt tells reason for 65 was prevent

busy events cdc track candidate purious matches between layers 1 and 5 with nothing in 3

paul working on spiraling pions, going well, code running, doing tests, problem cases dealing with them

add a dpi+ and dpi- factory for each of those for convenience

committee has been named, chair no charge yet data acquisition added mcbride, mchaus, marchand, perske with another from babar and/or cleo discussions with chair understood how much work it takes to utilitze grid need to have numbers outlines of slides have been done intro curtis, cpu requirements, mark parallel, with hall b for two hours, 40 minutes of slides anyway, another meeting next week with rolf june 7 & 8 outline of document for TDR/hand-out