Difference between revisions of "GlueX Offline Meeting, March 9, 2010"
(notes as minutes) |
|||
Line 33: | Line 33: | ||
# Time for new build?: all | # Time for new build?: all | ||
# [[Action Items From Hall-D Software Meetings | Action item]] review: all | # [[Action Items From Hall-D Software Meetings | Action item]] review: all | ||
+ | |||
+ | =Minutes= | ||
+ | |||
+ | David, Beni, Elliott, Mark, Craig, Sascha | ||
+ | |||
+ | truth and hits done, cdc wire, fdc cathode, fdc anode | ||
+ | noise hits in mcsmear, done | ||
+ | |||
+ | macos: | ||
+ | |||
+ | new mac mini, OS 10.6, default 64-bit, cernlib a problem | ||
+ | could get it to compile, crashed on running | ||
+ | root 5.26 runs root, linked to root programs no good | ||
+ | put on back burner | ||
+ | |||
+ | ded, Dave Heddle, has bcnu framework, full report in online meeting | ||
+ | 12gev bcnu | ||
+ | dac jevio | ||
+ | clas12 ced | ||
+ | halld ded | ||
+ | |||
+ | beni: generate fadc data | ||
+ | |||
+ | plan project/matching with reality | ||
+ | |||
+ | big issue: pwa, relation to project | ||
+ | there should be no physics in 12 GeV, construction only | ||
+ | need to have reconstruction in place | ||
+ | need to have some measure of pwa in place | ||
+ | what are human resources needed to execute the plan | ||
+ | pick some promising channels and see what it takes | ||
+ | three charged pions | ||
+ | throw out pwa | ||
+ | |||
+ | craig volunteers to be guinea pig |
Revision as of 17:37, 9 March 2010
GlueX Offline Meeting
Tuesday, February 9, 2010
2:00 pm EST
JLab: CEBAF Center F326/7
Telephone
To connect by telephone:
- dial:
- 800-377-8846 : US
- 888-276-7715 : Canada
- 302-709-8424 : International
- enter participant code: 77438230# (remember the "#")
Video Conferencing
A) ESNet: 8542553
B) EVO: direct meeting link
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2010-03
on the JLab CUE (you have to be a member of the "halld" Unix group). This directory is accessible from the web at https://halldweb1.jlab.org/talks/2010-03/ .
Agenda
- Review minutes from last meeting: all
- Announcements
- Error and Warning auto-nofify: Mon. and Thu.
- MacOS build work: David
- Building a roof over src: Mark
- ded, a new GlueX event display: Elliott
- Improvements in full event reconstruction : David
- Time for new build?: all
- Action item review: all
Minutes
David, Beni, Elliott, Mark, Craig, Sascha
truth and hits done, cdc wire, fdc cathode, fdc anode noise hits in mcsmear, done
macos:
new mac mini, OS 10.6, default 64-bit, cernlib a problem could get it to compile, crashed on running root 5.26 runs root, linked to root programs no good put on back burner
ded, Dave Heddle, has bcnu framework, full report in online meeting 12gev bcnu dac jevio clas12 ced halld ded
beni: generate fadc data
plan project/matching with reality
big issue: pwa, relation to project there should be no physics in 12 GeV, construction only need to have reconstruction in place need to have some measure of pwa in place what are human resources needed to execute the plan pick some promising channels and see what it takes three charged pions throw out pwa
craig volunteers to be guinea pig