Difference between revisions of "GlueX Offline Meeting, September 18, 2018"
From GlueXWiki
(→Agenda) |
|||
Line 37: | Line 37: | ||
Talks can be deposited in the directory <code>/group/halld/www/halldweb/html/talks/2018</code> on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2018/ . | Talks can be deposited in the directory <code>/group/halld/www/halldweb/html/talks/2018</code> on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2018/ . | ||
+ | |||
+ | == Minutes == | ||
+ | |||
+ | Present: | ||
+ | |||
+ | * ''' CMU: ''' Naomi Jarvis, Curtis Meyer | ||
+ | * ''' FSU: ''' Sean Dobbs | ||
+ | * ''' JLab: ''' Alex Austregesilo, Thomas Britton, Mark Ito (chair), Justin Stevens, Beni Zihlmann | ||
+ | * ''' MIT: ''' Cristiano Fanelli | ||
+ | * ''' Raleigh, NC: ''' David Lawrence | ||
+ | * ''' Yerevan: ''' Hrach Marukyan | ||
+ | |||
+ | There is a [https://bluejeans.com/s/GoPvv/ recording of this meeting] on the BlueJeans site. Use your JLab credentials to access it. | ||
+ | |||
+ | === Announcements === | ||
+ | |||
+ | # [https://mailman.jlab.org/pipermail/halld-offline/2018-September/003355.html New releases: AmpTools 0.9.4, halld_sim 3.4.0, MCwrapper 2.0.1]. The linked email has links to the release notes for each package. | ||
+ | #* AmpTools 0.9.4: Support for weighted events | ||
+ | #* halld_sim 3.4.0: Gets parameters for drift time-to-distance relationship from the CCDB. | ||
+ | #* MCwrapper 2.0.1: Uses generator binary names consistent with their containing directories. | ||
+ | #** This version has a problem with the bggen bash script. See Thomas if you are having difficulties. | ||
+ | # [https://github.com/JeffersonLab/build_scripts/releases/tag/1.39 New version of build_scripts: version 1.39]: Fixes build of cernlib to find lapack and blas libraries and successfully create the PAW binary. | ||
+ | # Status of Launches. | ||
+ | #* Alex reports that the reconstruction launch over 2017 data is 100% complete. It took 30 days to complete. There was no tape I/O bottleneck this time. Up to 1000 jobs were running on the farm simultaneously. Extrapolating, the Spring 2018 data should take 90 days to reconstruct if resources are similar. | ||
+ | ________________________________________________________________ | ||
+ | |||
+ | ##* [https://halldweb.jlab.org/data_monitoring/analysis/summary_swif_output_analysis_2017-01_ver19_batch01.html Analysis Launch 2017-01 ver19] : [https://halldweb.jlab.org/wiki-private/index.php/Spring_2017_Analysis_Launch#Version19 ~60 channels], ~80TB | ||
+ | ##* storage limited, not CPU | ||
+ | # Review of [[GlueX Offline Meeting, September 4, 2018#Minutes|minutes from the September 4 meeting]] (all) | ||
+ | # Review of the [[HDGeant4_Meeting,_September 11,_2018#Minutes|HDGeant4 Meeting from September 11]] | ||
+ | # [[GlueX-Collaboration-Sep-2018#Saturday_September_29.2C_2018_.28CC-L102.29|Software Items on the Collaboration Meeting Agenda]] | ||
+ | # NERSC Update | ||
+ | # Computing and Software Review | ||
+ | #* [https://halldweb.jlab.org/talks/2018/rolf_computing_review.pdf Email from Rolf] | ||
+ | #* [https://halldweb.jlab.org/talks/2018/12_GeV_Experimental_Computing_Review_Committee_Charge_v0-7.docx Charge] | ||
+ | #* [https://halldweb.jlab.org/talks/2018/12GeV_Software_Review_2018_agenda_v1.docx Agenda] | ||
+ | # Review of recent pull requests: | ||
+ | #* [https://github.com/JeffersonLab/halld_recon/pulls?q=is%3Aclosed+is%3Apr halld_recon] (all) | ||
+ | #* [https://github.com/JeffersonLab/halld_sim/pulls?q=is%3Aclosed+is%3Apr halld_sim] (all) | ||
+ | # Review of [https://groups.google.com/forum/#!forum/gluex-software recent discussion on the GlueX Software Help List] (all) | ||
+ | # Action Item Review (all) |
Revision as of 08:14, 19 September 2018
GlueX Offline Software Meeting
Tuesday, September 18, 2018
3:00 pm EDT (non-standard time)
JLab: CEBAF Center A110
BlueJeans: 968 592 007
Contents
Agenda
- Announcements
- New releases: AmpTools 0.9.4, halld_sim 3.4.0, MCwrapper 2.0.1.
- New version of build_scripts: version 1.39
- Status of Launches (Alex A.)
- Analysis Launch 2017-01 ver19 : ~60 channels, ~80TB
- storage limited, not CPU
- Review of minutes from the September 4 meeting (all)
- Review of the HDGeant4 Meeting from September 11
- Software Items on the Collaboration Meeting Agenda
- NERSC Update
- Computing and Software Review
- Review of recent pull requests:
- halld_recon (all)
- halld_sim (all)
- Review of recent discussion on the GlueX Software Help List (all)
- Action Item Review (all)
Communication Information
Remote Connection
- The BlueJeans meeting number is 968 592 007 .
- Join the Meeting via BlueJeans
Slides
Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2018
on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2018/ .
Minutes
Present:
- CMU: Naomi Jarvis, Curtis Meyer
- FSU: Sean Dobbs
- JLab: Alex Austregesilo, Thomas Britton, Mark Ito (chair), Justin Stevens, Beni Zihlmann
- MIT: Cristiano Fanelli
- Raleigh, NC: David Lawrence
- Yerevan: Hrach Marukyan
There is a recording of this meeting on the BlueJeans site. Use your JLab credentials to access it.
Announcements
- New releases: AmpTools 0.9.4, halld_sim 3.4.0, MCwrapper 2.0.1. The linked email has links to the release notes for each package.
- AmpTools 0.9.4: Support for weighted events
- halld_sim 3.4.0: Gets parameters for drift time-to-distance relationship from the CCDB.
- MCwrapper 2.0.1: Uses generator binary names consistent with their containing directories.
- This version has a problem with the bggen bash script. See Thomas if you are having difficulties.
- New version of build_scripts: version 1.39: Fixes build of cernlib to find lapack and blas libraries and successfully create the PAW binary.
- Status of Launches.
- Alex reports that the reconstruction launch over 2017 data is 100% complete. It took 30 days to complete. There was no tape I/O bottleneck this time. Up to 1000 jobs were running on the farm simultaneously. Extrapolating, the Spring 2018 data should take 90 days to reconstruct if resources are similar.
________________________________________________________________
- Analysis Launch 2017-01 ver19 : ~60 channels, ~80TB
- storage limited, not CPU
- Review of minutes from the September 4 meeting (all)
- Review of the HDGeant4 Meeting from September 11
- Software Items on the Collaboration Meeting Agenda
- NERSC Update
- Computing and Software Review
- Review of recent pull requests:
- halld_recon (all)
- halld_sim (all)
- Review of recent discussion on the GlueX Software Help List (all)
- Action Item Review (all)