Difference between revisions of "GlueX Offline Meeting, September 5, 2012"

From GlueXWiki
Jump to: navigation, search
(Minutes)
Line 40: Line 40:
 
* '''JLab''': Mark Ito (chair), David Lawrence, Dmitry Romanov, Sascha Somov, Simon Taylor, Elliott Wolin, Beni Zihlmann
 
* '''JLab''': Mark Ito (chair), David Lawrence, Dmitry Romanov, Sascha Somov, Simon Taylor, Elliott Wolin, Beni Zihlmann
  
report from review
+
==Announcements==
bash set-up
+
  
elliott
+
* report from June Software Review exists in draft form.
 +
* bash set-up for GlueX software ready for beta-testing
 +
* Elliott and Carl Timmer have complete EVIO version 4 working
 +
** random access io
 +
** support for dictionaries
 +
** contact Elliott for more information
  
carl have complete evio version 4 working
+
==Review of Minutes from the Last Meeting==
  random access io
+
  support for dictionaries
+
  call Elliott
+
  
bcal digitization, in the repository,
+
* new BCAL digitization, in the repository,
  bcal meeting minutes has instructions for use
+
** bcal meeting minutes has instructions for use
  available for early adopters
+
** available for early adopters
  
will no report
+
==Sub-group reports==
  
tracking
+
===Tracking===
  
checked in routine for dreference class to propagate error matrix, vertex code almost ready
+
* Simon checked in routine for DReferenceTrajectory class to propagate error matrix
 +
* vertex code almost ready
 +
* Beni providing interesting events errors and bug
  
beni providing interesting events errors and bug
+
===PID===
  
pid, paul
+
* Pauljust checked in a bunch of changes, minor
 +
** moving pid info into dkinematic data
 +
** added time variable to DKinematicData
 +
** start counter, tof, time at vertex
 +
** added covariance matrix for neutral showers
 +
* kinematic fitting, functional, vertex fit work, time not tested, multi-vertex not yet
 +
* analysis software, largely finished, almost ready to check-in
 +
* difference between REST and using raw data, needs to be tracked down
  
just checked in a bunch of changes, minor,
+
==Raw data tape==
  moving pid info into dkinematic data
+
  added time variable to dkinematic data
+
  start counter, tof, time at vertex
+
  added covariance matrix for neutral showers
+
  
kinematic fitting, functional, vertex fit work, time not tested, multivertex not yet
+
* should be done soon
 
+
* translation table, crate/slot/channel to jana object needed
analysis software, largely finished, almost ready to check-in
+
* read in evio event, for each bank, hardware translation
 
+
* XML formatted table in current implementation
difference between REST and using raw data, needs to be tracked down
+
* Dave and Elliott will figure it out
 
+
elliott
+
 
+
raw data tape, should be done soon
+
translation table, crate/slot/channel to jana object
+
read in evio event, for each bank, hardware translation
+
xml formatted table
+
 
+
dave and elliott will figure it out
+

Revision as of 08:37, 19 September 2012

GlueX Offline Software Meeting
Wednesday, September 5, 2012
1:30 pm EDT
JLab: CEBAF Center, F326/327

Agenda

  1. Announcements
    1. Scientific Computing Survey
  2. Review of minutes from the last meeting: all
  3. Report from Data Challenge Meeting
  4. Reconstruction sub-group reports
    1. Calorimeters
    2. Tracking
    3. PID
  5. CCDB Status: Dmitry
  6. Translation Tables: Elliott
  7. Action Item Review
  8. Review of recent repository activity: all

Communication Information

Video Conferencing

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-3Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-3Q/ .

Minutes

Present:

  • CMU: Will Levine, Paul Mattione, Curtis Meyer
  • JLab: Mark Ito (chair), David Lawrence, Dmitry Romanov, Sascha Somov, Simon Taylor, Elliott Wolin, Beni Zihlmann

Announcements

  • report from June Software Review exists in draft form.
  • bash set-up for GlueX software ready for beta-testing
  • Elliott and Carl Timmer have complete EVIO version 4 working
    • random access io
    • support for dictionaries
    • contact Elliott for more information

Review of Minutes from the Last Meeting

  • new BCAL digitization, in the repository,
    • bcal meeting minutes has instructions for use
    • available for early adopters

Sub-group reports

Tracking

  • Simon checked in routine for DReferenceTrajectory class to propagate error matrix
  • vertex code almost ready
  • Beni providing interesting events errors and bug

PID

  • Pauljust checked in a bunch of changes, minor
    • moving pid info into dkinematic data
    • added time variable to DKinematicData
    • start counter, tof, time at vertex
    • added covariance matrix for neutral showers
  • kinematic fitting, functional, vertex fit work, time not tested, multi-vertex not yet
  • analysis software, largely finished, almost ready to check-in
  • difference between REST and using raw data, needs to be tracked down

Raw data tape

  • should be done soon
  • translation table, crate/slot/channel to jana object needed
  • read in evio event, for each bank, hardware translation
  • XML formatted table in current implementation
  • Dave and Elliott will figure it out