+ | =Minutes= | ||
+ | |||
+ | PID Meeting, July 23 | ||
+ | |||
+ | Mark | ||
+ | |||
+ | tubes have not got there | ||
+ | |||
+ | discussion of laser: separate from led pulser system at | ||
+ | |||
+ | USC experience: | ||
+ | using multipaddle readout | ||
+ | choice of tdc at usc, using finer bin 25 ps, from CAEN | ||
+ | Paul chatting to Ralf | ||
+ | choosing a much thicker scintillator | ||
+ | after school starts | ||
+ | jlab china workshop: paul | ||
+ | esr: comes with adhesive backing, with or without uv inhibitor | ||
+ | • longevity: others have not reported problems, outdoor, solar energy applications | ||
+ | • non-metalic | ||
+ | • Paul IU interesed? Beni was thinking the same. | ||
+ | • mirror surface | ||
+ | |||
+ | Paul has a sample, enough for one paddle, maybe two if not continuous. Wants to buy roll. 12-15 k$ | ||
+ | |||
+ | held off on data acquisition until these studies are done | ||
+ | now going to merging tdc and adc read-out | ||
+ | |||
+ | MOU sent draft, sent to me | ||
+ | |||
+ | • opportunity to grab additional lab space | ||
+ | • stations for productions requires quasi-permanent space for various production steps | ||
+ | • section 5.1: no discussion of calibration system | ||
+ | • added elton's comments and corrections | ||
+ | • start moving this through | ||
+ | |||
+ | |||
+ | talkto fernando, splitting | ||
+ | |||
+ | |||
---- | ---- |
Revision as of 17:06, 23 July 2010
Location, Time
Friday, July 23, 2010
2:00 pm EDT
JLab: CEBAF Center, Room F326/7
ESNet: 8542553
EVO: direct meeting link[1]
Conference Group: 800-377-8846, participant code: 77438230
Slides: talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2010-07
on the JLab CUE (you have to be a member of the "halld" group). This directory is accessible from the web at https://halldweb1.jlab.org/talks/2010-07/ .
Agenda
- Announcements
- Minutes from the last meeting
- Time-of-Flight
- Prototype progress [1]
- Status of the MOU
- Start Counter
- prototype progress
- Target
- Status of the MOU
- Status of refrigerator plan
- Action Items
Minutes
PID Meeting, July 23
Mark
tubes have not got there
discussion of laser: separate from led pulser system at
USC experience: using multipaddle readout choice of tdc at usc, using finer bin 25 ps, from CAEN Paul chatting to Ralf choosing a much thicker scintillator after school starts jlab china workshop: paul esr: comes with adhesive backing, with or without uv inhibitor • longevity: others have not reported problems, outdoor, solar energy applications • non-metalic • Paul IU interesed? Beni was thinking the same. • mirror surface
Paul has a sample, enough for one paddle, maybe two if not continuous. Wants to buy roll. 12-15 k$
held off on data acquisition until these studies are done now going to merging tdc and adc read-out
MOU sent draft, sent to me
• opportunity to grab additional lab space • stations for productions requires quasi-permanent space for various production steps • section 5.1: no discussion of calibration system • added elton's comments and corrections • start moving this through
talkto fernando, splitting