GlueX Start Counter Meeting, February 7, 2019

From GlueXWiki
Revision as of 21:28, 7 February 2019 by Marki (Talk | contribs) (Add minutes)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

GlueX Start Counter Meeting
Thursday, February 7, 2019
10:00 am EST
CEBAF Center, Room L207
BlueJeans: 556 286 544

Agenda

  1. Announcements
  2. Review minutes from the meeting on January 24
  3. Calibration and Efficiency
  4. Start Counter time resolution CCDB table fix
  5. SiPM dark rate measurement (Beni)
  6. NIM Paper
  7. Action Item Review

Slides

Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2019 on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2019/ .

Minutes

Present:

  • FIU: Mahmoud Kamel
  • JLab: Thomas Britton, Mark Ito (chair), Simon Taylor

Review minutes from the meeting on January 24

We went over the minutes.

  • Beni completed Hot Check-Out for the Start Counter.
  • We are still thinking about a Start Counter Maintenance Program.

Calibration and Efficiency

Mahmoud had no new news to report. He noted that he and Sean Dobbs and agreed that there was no need for a new set of calibrations from Fall 2018 data; the start counter performance has been pretty stable.

Start Counter time resolution CCDB table fix

Simon reported on this recent pull request. The new CCDB table that contains resolution function information was not being referenced correctly in the code. Now it is.

Simon also told us that there remains a bug in halld_recon causing crashes in reconstruction jobs, with high-level detector timing. These have shown up in recent monitoring launches.

SiPM dark rate measurement

Mahmoud mentioned Beni Zihlmann's log entry on the SiPM dark rate run mentioned at the last meeting. Data has been taken and the analysis is likely in progress.