Difference between revisions of "GlueX Start Counter Meeting, June 12, 2014"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 8: | Line 8: | ||
# Review [[GlueX Start Counter Meeting, May 29, 2014#Minutes|minutes from previous meeting]] | # Review [[GlueX Start Counter Meeting, May 29, 2014#Minutes|minutes from previous meeting]] | ||
# Detector Construction Status (Eric) | # Detector Construction Status (Eric) | ||
+ | #* [https://halldweb1.jlab.org/talks/2014-2Q/lenzer_email_2014-06-04.pdf Bruce's Email] | ||
# Support Structure Construction Status (Tim/Chuck) | # Support Structure Construction Status (Tim/Chuck) | ||
# Schedule Review (all) | # Schedule Review (all) |
Revision as of 17:48, 11 June 2014
GlueX Start Counter Meeting
Thursday, June 12, 2014
10:00 am EDT
Agenda
- Announcements
- Review minutes from previous meeting
- Detector Construction Status (Eric)
- Support Structure Construction Status (Tim/Chuck)
- Schedule Review (all)
- Software Status (all)
- Bias Voltage Control: planned for August
Meeting Information
JLab Meeting Room: CEBAF Center F326
BlueJeans
The BlueJeans Meeting ID is 556286544 .
- Web Browser
- Room System (e. g. Polycom H.323 device)
- 199.48.152.152 or bjn.vc
- Enter Meeting ID or use the pairing code shown on the room system
- Telephone
- Dial-in: +1 408 740 7256 or +1 888 240 2560 (US or Canada only) (other phone numbers)
- Enter Meeting ID
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2014-2Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2014-2Q/ .