The meeting was cancelled, but Werner and Mark had a conversation on status.
  
# Announcements
+
=Notes from Conversation between Werner and Mark=
# Review [[GlueX Start Counter Meeting, June 2, 2011#Minutes|minutes from previous meeting]]: all
+
# Start Counter Prototype Work
+
# MOU status
+
  
=Communication Information=
+
==Prototype Tests==
  
==Telephone==
+
FIU has received five scintillators from Plastic Craft. These are cut and bent to a functional shape for the start counter. They have not been tested yet.
  
To connect by telephone:
+
Initially they will be tested with the 6 mm x 10 mm x 1.4 m light guide that Werner used in previous tests. A fine-mesh tube will be used. Lei is also working on making a light guide from the fibers received from Saint Gobain.
# dial:
+
#* US and Canada: (866)740-1260 (toll free)
+
#* International: (303)248-0285 (toll call) or look up toll-free number at http://www.readytalk.com/intl
+
# enter access code followed by the # sign: 3421244#
+
  
==Video Conferencing==
+
The large dark box to enclose the prototype is almost done.
  
* ESNet: 8542553
+
==SiPM's==
* [http://evo.caltech.edu/ EVO]:
+
** Meeting URL: http://evo.caltech.edu/evoNext/koala.jnlp?meeting=eaeDetvlv8a9asasIa <!--good through June 2-->
+
** Phone Bridge ID: 8 5557
+
  
==Slides==
+
We have not succeeded in getting newer configurations of SiPM's for Werner to test. We need to meet with Fernando to discuss options.
  
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2011-2Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-2Q/ . You have to be a member of the "halld" Unix group to do this.
+
==MOU==
 +
 
 +
A draft with changes from Glenn was sent to Allison on Tuesday. She returned a marked up draft soon after. Mark will incorporate her changes and answer questions. If that version looks OK, then it is off the the Concurrence Chain.

Latest revision as of 15:48, 16 June 2011

Location, Time

Thursday, June 16, 2011
3:30 pm EDT
JLab: CEBAF Center, Room F326/7

The meeting was cancelled, but Werner and Mark had a conversation on status.

Notes from Conversation between Werner and Mark

Prototype Tests

FIU has received five scintillators from Plastic Craft. These are cut and bent to a functional shape for the start counter. They have not been tested yet.

Initially they will be tested with the 6 mm x 10 mm x 1.4 m light guide that Werner used in previous tests. A fine-mesh tube will be used. Lei is also working on making a light guide from the fibers received from Saint Gobain.

The large dark box to enclose the prototype is almost done.

SiPM's

We have not succeeded in getting newer configurations of SiPM's for Werner to test. We need to meet with Fernando to discuss options.

MOU

A draft with changes from Glenn was sent to Allison on Tuesday. She returned a marked up draft soon after. Mark will incorporate her changes and answer questions. If that version looks OK, then it is off the the Concurrence Chain.