Difference between revisions of "GlueX Start Counter Meeting, March 22, 2012"

From GlueXWiki
Jump to: navigation, search
(Minutes: present)
(Minutes)
Line 36: Line 36:
 
* '''JLab''': Fernando Barbosa, Chuck Hutton, Mark Ito (chair), Beni Zihlmann
 
* '''JLab''': Fernando Barbosa, Chuck Hutton, Mark Ito (chair), Beni Zihlmann
  
still waiting on mcneal, no news
+
==Prototype Report==
 +
 
 +
We are still waiting for a prototype counter from McNeal.
 +
 
 +
==Readout Design==
 +
 
 +
Since the last meeting, we had a meeting with Fernando to answer some basic questions. At that meeting we decided on a segmentation of 10, to aid alignment and to simplify fabrication of the circuit board. Since then Chuck has done some work on the design and we reviewed [? his slides] showing the latest version.
  
 
variation in gain if temperture not stabilized
 
variation in gain if temperture not stabilized

Revision as of 15:40, 22 March 2012

GlueX Start Counter Meeting
Thursday, March 22, 2012
10 am EDT
JLab: CEBAF Center, Room 326/327

Agenda

  1. Announcements
  2. Review minutes from previous meeting
  3. Prototype Report
  4. Readout Design
  5. Contract Status
  6. Simulation

Communication Information

Video Conferencing

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-1Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-1Q/ .

Chair's Cell Phone

(757)504-0664

Minutes

Present:

  • FIU: Werner Boeglin, Puneet Khetarpal, Eric Pooser
  • JLab: Fernando Barbosa, Chuck Hutton, Mark Ito (chair), Beni Zihlmann

Prototype Report

We are still waiting for a prototype counter from McNeal.

Readout Design

Since the last meeting, we had a meeting with Fernando to answer some basic questions. At that meeting we decided on a segmentation of 10, to aid alignment and to simplify fabrication of the circuit board. Since then Chuck has done some work on the design and we reviewed [? his slides] showing the latest version.

variation in gain if temperture not stabilized bias voltage,

b cal contact with cooling plate uniform pressure needed

back side of electronics support ring on target vacuum chamber

mounting collar for start counter, assemble completely independently with electronics. bolt the whole thing on the vacuum chamber

hall b design experience: foam, light guide, counter suppport


Monday youri meeting with chuck