Difference between revisions of "GlueX Start Counter Meeting, May 3, 2012"

From GlueXWiki
Jump to: navigation, search
(Created page with "GlueX Start Counter Meeting<br> Thursday, May 3, 2012<br> 10 am EDT<br> JLab: CEBAF Center, Room 326/327<br> =Agenda= # Announcements # Review [[GlueX Start Counter Meeting, Ap...")
 
(notes as minutes)
Line 25: Line 25:
  
 
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2012-2Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-2Q/ .
 
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2012-2Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-2Q/ .
 +
 +
=Minutes=
 +
 +
werner, buneet
 +
beni, tim,mark, elton
 +
 +
• McNeal, sample still has not come in
 +
• build, in finishing
 +
 +
sipm board
 +
• 3 sectors ok
 +
• 3 bias voltages
 +
• outrigger board
 +
• thermister, not used
 +
∘ elton and werner prefer it
 +
∘ does set point temp need to be known in advance?
 +
 +
new geometry for stat counters ready
 +
• remove long light guides
 +
• puneet will do it
 +
• may have to add some material for sipm boards
 +
 +
LED system
 +
• usefull to vary intesnsity, check efficiency, if fsast, can look at timing resolution
 +
 +
Mechanical
 +
 +
• inner support to be machined out of one piece
 +
• no foam on the outside
 +
• light-tighting an issue

Revision as of 12:55, 3 May 2012

GlueX Start Counter Meeting
Thursday, May 3, 2012
10 am EDT
JLab: CEBAF Center, Room 326/327

Agenda

  1. Announcements
  2. Review minutes from previous meeting
  3. Prototype Report
  4. Readout Design
  5. Contract Status
  6. Simulation

Communication Information

Video Conferencing

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-2Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-2Q/ .

Minutes

werner, buneet beni, tim,mark, elton

• McNeal, sample still has not come in • build, in finishing

sipm board • 3 sectors ok • 3 bias voltages • outrigger board • thermister, not used ∘ elton and werner prefer it ∘ does set point temp need to be known in advance?

new geometry for stat counters ready • remove long light guides • puneet will do it • may have to add some material for sipm boards

LED system • usefull to vary intesnsity, check efficiency, if fsast, can look at timing resolution

Mechanical

• inner support to be machined out of one piece • no foam on the outside • light-tighting an issue