GlueX Start Counter Meeting, May 3, 2012

From GlueXWiki
Revision as of 13:05, 3 May 2012 by Marki (Talk | contribs) (Minutes)

Jump to: navigation, search

GlueX Start Counter Meeting
Thursday, May 3, 2012
10 am EDT
JLab: CEBAF Center, Room 326/327

Agenda

  1. Announcements
  2. Review minutes from previous meeting
  3. Prototype Report
  4. Readout Design
  5. Contract Status
  6. Simulation

Communication Information

Video Conferencing

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-2Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-2Q/ .

Minutes

Present:

  • FIU: Werner Boeglin, Puneet Khetarpal
  • JLab: Mark Ito (chair), Elton Smith, Tim Whitlatch, Beni Zihlmann

Prototype

The sample counter has still not come in from McNeal. It has been built and now is "in finishing."

Read-Out

Mark reported on his conversation with Fernando. Fernando has started thinking about the design of the SiPM board • 3 sectors ok • 3 bias voltages • outrigger board • thermister, not used ∘ elton and werner prefer it ∘ does set point temp need to be known in advance?

new geometry for stat counters ready • remove long light guides • puneet will do it • may have to add some material for sipm boards

LED system • usefull to vary intesnsity, check efficiency, if fsast, can look at timing resolution

Mechanical

• inner support to be machined out of one piece • no foam on the outside • light-tighting an issue