Difference between revisions of "GlueX Start Counter Meeting, November 13, 2023"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 18: Line 18:
 
*** Annealing program started heating at 47 degree Celsius with "heat-tape". Initial exposure time is till Christmas break.
 
*** Annealing program started heating at 47 degree Celsius with "heat-tape". Initial exposure time is till Christmas break.
 
*** Operating voltages can not be increased in order to bump up the gain. The dark rate increases exponentially.
 
*** Operating voltages can not be increased in order to bump up the gain. The dark rate increases exponentially.
* Start Counter for KLF: Agenda points requested by KLF group
+
* Start Counter for KLF: Agenda points requested by KLF group ([https://halldweb.jlab.org/talks/2023/sc_with_KLF_beam.gif GlueX Start Counter Geometry])
 
** SC upgrade (including plastic and detectors)
 
** SC upgrade (including plastic and detectors)
 
** Its connection to Cryo target
 
** Its connection to Cryo target

Revision as of 09:21, 13 November 2023

GlueX Start Counter Meeting
Monday, November 13, 2023
9:00 am EDT

Meeting information: https://jlab-org.zoomgov.com/j/1604147172?pwd=QjRtMDRRQ0lVNW5oVVA0VmFMSnh1dz09
Benedikt Zihlmann is inviting you to a scheduled ZoomGov meeting.
Topic: Start Counter

Agenda

  • Start Counter status:
  • Start Counter for KLF: Agenda points requested by KLF group (GlueX Start Counter Geometry)
    • SC upgrade (including plastic and detectors)
    • Its connection to Cryo target
    • A possibility to use JLab machine shop for SC
    • Can Hall D pay for the SC work

Minutes

present:


Action Items

Slides

Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2023 on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2023/ .