Difference between revisions of "GlueX TOF Meeting, August 4, 2011"

From GlueXWiki
Jump to: navigation, search
(Minutes: links and blanks)
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private")
 
(2 intermediate revisions by the same user not shown)
Line 11: Line 11:
 
# Prototype Status [http://hadron.physics.fsu.edu/~ostrov/tof/20110804/]
 
# Prototype Status [http://hadron.physics.fsu.edu/~ostrov/tof/20110804/]
 
# Contract Status
 
# Contract Status
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1713 Schedule]
+
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1713 Schedule]
  
  
Line 32: Line 32:
 
==Slides==
 
==Slides==
  
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2011-3Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-3Q/ .
+
Talks can be deposited in the directory <code>/group/halld/www/halldweb/html/talks/2011-3Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2011-3Q/ .
  
 
=Minutes=
 
=Minutes=
Line 49: Line 49:
 
==Prototype status==
 
==Prototype status==
  
Sasha made some further tests to investigate the effect of trigger thresholds on his ADC spectra and to obtain time walk corrections. See [https://halldweb1.jlab.org/talks/2011-3Q/ADC%20spectra%20and%20Time-walk%20corrections.html his web page] for details. He is able to extract corrections and improve the resolution in mean time only from 265 to 250 ps by applying them.
+
Sasha made some further tests to investigate the effect of trigger thresholds on his ADC spectra and to obtain time walk corrections. See [https://halldweb.jlab.org/talks/2011-3Q/ADC%20spectra%20and%20Time-walk%20corrections.html his web page] for details. He is able to extract corrections and improve the resolution in mean time only from 265 to 250 ps by applying them.
  
 
Sasha could use some more splitters. Mark will ask Fernando about making some more.
 
Sasha could use some more splitters. Mark will ask Fernando about making some more.

Latest revision as of 17:13, 24 February 2017

Location, Time

Thursday, August 4, 2011
10:00 am EDT
JLab: CEBAF Center, Room F326

Agenda

  1. Announcements
  2. Minutes from the last meeting
  3. Prototype Status [1]
  4. Contract Status


Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: EVO site

Telephone

  1. dial:
  2. enter access code followed by the # sign: 3421244#

Slides

Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2011-3Q on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2011-3Q/ .

Minutes

Present:

  • FSU: Sasha Ostrovidov
  • JLab: Mark Ito (chair), Chuck Hutton, Tim Whitlatch, Beni Zihlmann

Review of minutes from the last meeting

We looked over the minutes from the July 21 meeting.

  • The light guide sent to Polymer Plastics for vapor polishing came back. Sasha reported that Paul was not happy with the surface quality.
  • Chuck received the dimensions of the steel tube from Paul.

Prototype status

Sasha made some further tests to investigate the effect of trigger thresholds on his ADC spectra and to obtain time walk corrections. See his web page for details. He is able to extract corrections and improve the resolution in mean time only from 265 to 250 ps by applying them.

Sasha could use some more splitters. Mark will ask Fernando about making some more.

Contract

Mark has started work on a draft of the statement of work. The text is written. It is missing some milestones. He will get those from Elton's schedule.