Difference between revisions of "GlueX TOF Meeting, December 12, 2011"
From GlueXWiki
(→Agenda) |
|||
Line 11: | Line 11: | ||
#* Trip Report | #* Trip Report | ||
#* Splitter or dynode for ADC? | #* Splitter or dynode for ADC? | ||
+ | #* Prototype studies [http://hadron.physics.fsu.edu/~ostrov/tof/20111209/] | ||
# Contract Status: Mark | # Contract Status: Mark | ||
#* Construction Manual | #* Construction Manual |
Revision as of 11:55, 9 December 2011
Friday, December 9, 2011
11:00 am EST
JLab: CEBAF Center, Room F326
Agenda
- Announcements
- Minutes from the last meeting
- Mechanical design: Tim, Chuck
- Prototype status: Paul, Sasha, Beni, Test Stand at FSU
- Trip Report
- Splitter or dynode for ADC?
- Prototype studies [1]
- Contract Status: Mark
- Construction Manual
- Quality Assurance Plan/Acceptance Procedures
- Construction Manager
- Construction Schedule
Communication
Videoconference
- ESNet: 8542553
- EVO: EVO site
- direct meeting link
- Phone Bridge ID: 443 0818
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2011-4Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-4Q/ .