GlueX TOF Meeting, December 12, 2011

From GlueXWiki
Revision as of 15:31, 12 December 2011 by Marki (Talk | contribs) (notes as minutes)

Jump to: navigation, search

Monday, December 12, 2011
9:30 am EST
JLab: CEBAF Center, Room F326

Agenda

  1. Announcements
  2. Minutes from the last meeting
  3. Mechanical design: Tim, Chuck
  4. Prototype status: Paul, Sasha, Beni, Test Stand at FSU
    • Trip Report
    • Splitter or dynode for ADC?
    • Prototype studies [1]
  5. Contract Status: Mark
    • Construction Manual
    • Quality Assurance Plan/Acceptance Procedures
    • Construction Manager
    • Construction Schedule

Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: EVO site

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2011-4Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-4Q/ .

Minutes

tof meeting minutes

present: fsu: Paul, Sasha jlab: Mark, Beni, Eugene, Chuck, Simon

glueing:

 optical epoxy used now?
 grease
 RTV
 

Using grease on trigger

program to explore gluing Eugene will send info to Paul

10-stage tube uniformly an attractive option

email outline all information

chuck silicon cookies, changes support issues got copy of new light guide

paul vinyl cutter for vm2000 paul will work on getting bigger sheets or a roll