Difference between revisions of "GlueX TOF Meeting, July 21, 2011"

From GlueXWiki
Jump to: navigation, search
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private")
 
(8 intermediate revisions by the same user not shown)
Line 13: Line 13:
 
# Prototype Status [http://hadron.physics.fsu.edu/~ostrov/tof/20110721/]
 
# Prototype Status [http://hadron.physics.fsu.edu/~ostrov/tof/20110721/]
 
# Contract Status
 
# Contract Status
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1713 Schedule]
+
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1713 Schedule]
  
  
Line 34: Line 34:
 
==Slides==
 
==Slides==
  
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2011-3Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-3Q/ .
+
Talks can be deposited in the directory <code>/group/halld/www/halldweb/html/talks/2011-3Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2011-3Q/ .
 +
 
 +
=Minutes=
 +
 
 +
Present:
 +
* '''FSU''': Paul Eugenio, Sasha Ostrovidov
 +
* '''JLab''': Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Simon Taylor, Beni Zihlmann
 +
 
 +
==Construction==
 +
* Ian Winger sent Chuck a 3-D drawing of the split light guides.
 +
* Paul will be busy with his DOE annual for the next week or so.
 +
* Three more light guides have been made from the UVT material.
 +
** These will be compared to non-UVT versions.
 +
* FSU Physics machine shop playing with procedure for fabrication.
 +
** They are getting good finishes with the new bit.
 +
* One light guide, was sent to Polymer Plastics for vapor polishing. It was due back this week.
 +
* Paul has talked to folks at Eljen about how they do polishing
 +
** Although vapor polishing will give good results, it is likely not better than hand polishing.
 +
** Paul purchased got some polishing compounds to try.
 +
** The Physics Department bought a new buffing station suitable for light guides.
 +
* No testing with the new light guides has been done yet.
 +
* Paul will send Chuck the dimenions of the steel tube.
 +
 
 +
==Contract==
 +
 
 +
Paul prepared a version of the statement of work, but the text was lost. Mark volunteered to write a draft.
 +
 
 +
==Time-Walk Correction Tests==
 +
 
 +
Sasha tried out the technique that Elton described in a [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1719 recent note]. See [https://halldweb.jlab.org/talks/2011-3Q/Time-walk%20corrections.html his plots] for details. Cosmic data taken with prototype counters show some of the general features expected, but there is a non-Laudau distributed background in the sample that complicates the fits.

Latest revision as of 17:01, 24 February 2017

Location, Time

NOTE: new standard room, date, and time!

Thursday, July 21, 2011
10:00 am EDT
JLab: CEBAF Center, Room F326

Agenda

  1. Announcements
  2. Minutes from the last meeting
  3. Prototype Status [1]
  4. Contract Status


Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: EVO site

Telephone

  1. dial:
  2. enter access code followed by the # sign: 3421244#

Slides

Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2011-3Q on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2011-3Q/ .

Minutes

Present:

  • FSU: Paul Eugenio, Sasha Ostrovidov
  • JLab: Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Simon Taylor, Beni Zihlmann

Construction

  • Ian Winger sent Chuck a 3-D drawing of the split light guides.
  • Paul will be busy with his DOE annual for the next week or so.
  • Three more light guides have been made from the UVT material.
    • These will be compared to non-UVT versions.
  • FSU Physics machine shop playing with procedure for fabrication.
    • They are getting good finishes with the new bit.
  • One light guide, was sent to Polymer Plastics for vapor polishing. It was due back this week.
  • Paul has talked to folks at Eljen about how they do polishing
    • Although vapor polishing will give good results, it is likely not better than hand polishing.
    • Paul purchased got some polishing compounds to try.
    • The Physics Department bought a new buffing station suitable for light guides.
  • No testing with the new light guides has been done yet.
  • Paul will send Chuck the dimenions of the steel tube.

Contract

Paul prepared a version of the statement of work, but the text was lost. Mark volunteered to write a draft.

Time-Walk Correction Tests

Sasha tried out the technique that Elton described in a recent note. See his plots for details. Cosmic data taken with prototype counters show some of the general features expected, but there is a non-Laudau distributed background in the sample that complicates the fits.