GlueX TOF Meeting, June 21, 2012
Thursday, June 21, 2012
10:00 am EDT
JLab: CEBAF Center, F326
Contents
Agenda
- Announcements
- Review of last TOF bi-weekly meeting
- Mechanical design
- Prototype status
- TDC choice
- Contract Status
- Cable labeling scheme
- Calibration and Alignment
- Technical Design Report contribution
Communication
Videoconference
- ESNet: 8542553
- EVO: EVO site
- meeting link
- Phone bridge ID: 13 7104
Slides
Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2012-2Q
on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2012-2Q/ .
Minutes
Present:
- FSU: Kurt Koetz, Sasha Ostrovidov, Randall Smith, Ian Winger
- JLab: Chuck Hutton, Mark Ito (chair), Beni Zihlmann
Calibration and Alignment
Mark asked Sasha and Beni to come up with a plan.
Contract Status
JLab is waiting for FSU to send a response to technical questions about their proposal.
Mechanical Design
We agreed the the FSU team should review the drawings Chuck produced and come up with some discussion items. Mark will email the PDF's to Randall, Kurt, and Ian. They are also posted on the web.
TDC Choice
Eugene has pointed out the difficulty of a significant cost increase on the email list. Also on the list, Sasha pointed out that the TDC he is using has 32 channels rather than 16. The cost estimate will have to be revisited.
[Added in press] Eugene has revised his estimate. Still the cost increase is not insignificant.