Difference between revisions of "GlueX TOF Meeting, June 23, 2011"

From GlueXWiki
Jump to: navigation, search
(notes as minutes)
Line 36: Line 36:
  
 
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2011-2Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-2Q/ .
 
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2011-2Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-2Q/ .
 +
 +
=Minutes=
 +
 +
Present:
 +
• '''FSU''': sasha
 +
• '''JLab''': Mark Ito, beni, chuck simon, paul, tim
 +
 +
Paul machine out of single piece
 +
want far enought awy to put shielding on
 +
shielding support, light guid support
 +
light guide glued to scint
 +
tim: how to attach to fcal
 +
- lots of decisions
 +
 +
definition of light guide, need
 +
paul will send chuck specification of pmt geometry
 +
 +
two options:
 +
1 bend lucite
 +
2 machine out of single piece
 +
 +
paul arrange conference call on how to transmit 3-d design to nc machine
 +
 +
question on material
 +
3" rod, ng, need 3.5" rod
 +
up to 3" standard
 +
price goes up from 3" to 3.5" up by factor of 2.5
 +
 +
meeting designers thu, 11 am 30th
 +
 +
material for 3.5" send me what you want
 +
 +
is uvt required
 +
 +
vapor polishing: free trial offer, for light guides
 +
paul will send out information
 +
 +
paul will write draft statement of work with specification
 +
  send to mark and will be reviewed
 +
 +
do pmt's need specification in fsu contract
 +
 +
meeting time, 10 am on thursdays

Revision as of 15:44, 23 June 2011

Location, Time

NOTE: Non-standard room, date, and time!

Thursday, May 23, 2011
11:00 am EDT
JLab: CEBAF Center, Room L207

Agenda

  1. Announcements
  2. Minutes from the last meeting
  3. Mantis task tracker project for TOF: Mark
  4. Prototype Status [1]
  5. Contract Status
  6. Meeting time

Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: EVO site

Telephone

  1. dial:
  2. enter access code followed by the # sign: 3421244#

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2011-2Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-2Q/ .

Minutes

Present: • FSU: sasha • JLab: Mark Ito, beni, chuck simon, paul, tim

Paul machine out of single piece want far enought awy to put shielding on shielding support, light guid support light guide glued to scint tim: how to attach to fcal - lots of decisions

definition of light guide, need paul will send chuck specification of pmt geometry

two options: 1 bend lucite 2 machine out of single piece

paul arrange conference call on how to transmit 3-d design to nc machine

question on material 3" rod, ng, need 3.5" rod up to 3" standard price goes up from 3" to 3.5" up by factor of 2.5

meeting designers thu, 11 am 30th

material for 3.5" send me what you want

is uvt required

vapor polishing: free trial offer, for light guides paul will send out information

paul will write draft statement of work with specification

 send to mark and will be reviewed

do pmt's need specification in fsu contract

meeting time, 10 am on thursdays