Difference between revisions of "GlueX TOF Meeting, March 4, 2011"

From GlueXWiki
Jump to: navigation, search
m (Text replacement - "www/halldweb1/" to "www/halldweb/")
 
(8 intermediate revisions by the same user not shown)
Line 32: Line 32:
 
==Slides==
 
==Slides==
  
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2011-1Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-1Q/ .
+
Talks can be deposited in the directory <code>/group/halld/www/halldweb/html/talks/2011-1Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2011-1Q/ .
 +
 
 +
=Minutes=
 +
 
 +
Present:
 +
* '''FSU''': Sasha Ostrovidov
 +
* '''JLab''': Mark Ito (chair), Elton Smith, Simon Taylor, Tim Whitlatch, Beni Zihlmann
 +
 
 +
==Review of minutes from the last meeting==
 +
 
 +
We reviewed the minutes of the [[GlueX TOF Meeting, February 18, 2011#Minutes|February 18th]] meeting.
 +
 
 +
* Sasha asked Beni what he did to get the 41 ps intrinsic resolution with the F1 TDC. Beni did his test putting two versions of the same signal into different channels of the TDC. Sasha will try this.
 +
* Sasha is waiting for a 25 ps least count TDC from CAEN to arrive.
 +
* '''Geometry'''. We had a rather meandering discussion of how best to arrange the TOF counters. Options on the table include:
 +
*# Widening the counters from 6 cm to 8 cm to allow PMT's to be in a collinear arrangement.
 +
*# Shifting alternate counters (in z) enough to allow straight light guides.
 +
*# Collinear counters with curved light guides to avoid interference between PMT's from neighboring counters.
 +
 
 +
==Prototype Status==
 +
 
 +
Sasha showed several [https://halldweb.jlab.org/talks/2011-1Q/tof_20110304/ plots of time differences from the prototype], both from the counter under test and trigger counters. Some of them exhibit strange multiple peaks. We will ship another TDC to FSU in parallel with continued efforts to understand what is going on.
 +
 
 +
==Support/Installation Concept==
 +
 
 +
We looked at [[Media:TOF install concept.png|a slide]], from nearly two years ago, of the concept of supporting the TOF. This is still the "current" concept.
 +
 
 +
==Contract Status==
 +
 
 +
Mark has started on an Advanced Procurement Plan (APP), a schedule for putting the construction contract into place. Elton's Fastrack schedule will provide input.

Latest revision as of 22:03, 31 March 2015

Location, Time

Friday, March 4, 2011
2:00 pm EST
JLab: CEBAF Center, Room L207

Agenda

  1. Announcements
  2. Minutes from the last meeting
  3. Prototype Status [1]
  4. Support/Installation Concept
    TOF installation concept
  5. Contract Status

Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: EVO site


Telephone

  1. dial:
  2. enter access code followed by the # sign: 3421244#

Slides

Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2011-1Q on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2011-1Q/ .

Minutes

Present:

  • FSU: Sasha Ostrovidov
  • JLab: Mark Ito (chair), Elton Smith, Simon Taylor, Tim Whitlatch, Beni Zihlmann

Review of minutes from the last meeting

We reviewed the minutes of the February 18th meeting.

  • Sasha asked Beni what he did to get the 41 ps intrinsic resolution with the F1 TDC. Beni did his test putting two versions of the same signal into different channels of the TDC. Sasha will try this.
  • Sasha is waiting for a 25 ps least count TDC from CAEN to arrive.
  • Geometry. We had a rather meandering discussion of how best to arrange the TOF counters. Options on the table include:
    1. Widening the counters from 6 cm to 8 cm to allow PMT's to be in a collinear arrangement.
    2. Shifting alternate counters (in z) enough to allow straight light guides.
    3. Collinear counters with curved light guides to avoid interference between PMT's from neighboring counters.

Prototype Status

Sasha showed several plots of time differences from the prototype, both from the counter under test and trigger counters. Some of them exhibit strange multiple peaks. We will ship another TDC to FSU in parallel with continued efforts to understand what is going on.

Support/Installation Concept

We looked at a slide, from nearly two years ago, of the concept of supporting the TOF. This is still the "current" concept.

Contract Status

Mark has started on an Advanced Procurement Plan (APP), a schedule for putting the construction contract into place. Elton's Fastrack schedule will provide input.