GlueX TOF Meeting, March 4, 2011

From GlueXWiki
Revision as of 20:35, 6 March 2011 by Marki (Talk | contribs) (Review of minutes from the last meeting)

Jump to: navigation, search

Location, Time

Friday, March 4, 2011
2:00 pm EST
JLab: CEBAF Center, Room L207

Agenda

  1. Announcements
  2. Minutes from the last meeting
  3. Prototype Status [1]
  4. Support/Installation Concept
    TOF installation concept
  5. Contract Status

Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: EVO site


Telephone

  1. dial:
  2. enter access code followed by the # sign: 3421244#

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2011-1Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-1Q/ .

Minutes

Present:

  • FSU: Sasha Ostrovidov
  • JLab: Mark Ito (chair), Elton Smith, Simon Taylor, Tim Whitlatch, Beni Zihlmann

Review of minutes from the last meeting

We reviewed the minutes of the January ??? meeting.

  • Sasha asked Beni what he did to get the 41 ps intrinsic resolution with the F1 TDC. Beni did his test putting two versions of the same signal into different channels of the TDC. Sasha will try this.
  • Sasha is waiting for a 25 ps least count TDC from CAEN to arrive.
  • Geometry. We had a rather meandering discussion of how best to arrange the TOF counters. Options on the table include:
    1. Widening the counters from 6 cm to 8 cm to allow PMT's to be in a collinear arrangement.
    2. Shifting alternate counters (in z) enough to allow straight light guides.
    3. Collinear counters with curved light guides to avoid interference between PMT's from neighboring counters.

Prototype Status

Sasha showed several [??? plots of time differences from the prototype], both from the counter under test and trigger counters. Some of them exhibit strange multiple peaks. We will ship another TDC to FSU in parallel with continued efforts to understand what is going on.

beni agrees to ship a tdc to FSU fishtail OK tow possivble schedules mdrive

construction

numbers for bending, machining, straight